Installation of pvc-profile window blocks in the stone walls of residential and public buildings. Installation in the stone walls of residential and public buildings of window blocks made of PVC profiles Gasn 10 05 001 02 scope of work

Collection #10

WOODEN STRUCTURES

GESN-2001-10

ADDITIONS TO REGULATIONS

Table GESN 10-01-034 Installation of window blocks made of PVC profiles in residential and public buildings

Scope of work:

01. Preparing the frame for pre-installation in the opening.

02. Installing the frame on technological wedges in the opening and setting it in a horizontal plane.

03. Device on the frame of marks for drilling holes for the dowel.

04. Removing the frame.

05. Drilling holes for dowels (from outside to inside the frame).

06. Installation of the frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges.

07. Drilling the wall for dowels using the existing holes.

08. Installation of dowels.

09. Filling the gap between the frame and the wall mounting foam.

10. Installation of double-glazed windows.

11. The device of the outer water-proof vapor-permeable layer.

12. The device of the internal vapor barrier layer.

13. Installation of fittings.

Meter: 100 m 2 openings

Installation of window blocks made of PVC profiles in residential and public buildings:

10-01-034-1 deaf with an opening area of ​​up to 2 m 2

10-01-034-2 deaf with an opening area of ​​more than 2 m 2

10-01-034-3 swivel (folding, tilt-and-turn) with an opening area of ​​up to 2 m 2 single-leaf

10-01-034-4 rotary (folding, tilt-and-turn) with an opening area of ​​more than 2 m 2

single leaf

10-01-034-5 rotary (folding, tilt-and-turn) with opening area up to 2 m 2

bivalve

10-01-034-6 swivel (folding, tilt-and-turn) with an opening area of ​​more than 2 m 2 double-leaf

10-01-034-7 rotary (folding, tilt-and-turn) with an opening area of ​​up to 2 m 2 three-leaf, including in the presence of fixed glazing leaves

10-01-034-8 swivel (tilt, tilt-and-turn) with an opening area of ​​more than 2 m2 three-leaf, including in the presence of fixed glazing sashes

Resource ID

Cost element name

Unit meas.

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Electric perforators

MATERIALS

Polyurethane foam sealant (mounting foam) type Markrofleks, Soudal in cylinders of 750 ml

Butyl tape

Diffusion butyl tape

Butyl tape PSUL

Plastic mounting wedges

Plastic window blocks

Resource ID

Cost element name

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Construction mast hoists 0.5 t

Construction and installation screwdrivers

Electric perforators

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

Mounting dowels 10x130 (10x132, 10x150) mm

Butyl tape

Diffusion butyl tape

Butyl tape PSUL

Plastic mounting wedges

Plastic window blocks

Table GESN 10-01-035 Installation of PVC window sills

Scope of work:

01. Inserting a window sill into the window sill groove of the window block with leveling.

02. Fixing the window sill with wedges.

03. Treatment of seams and voids with foam.

Gauge: 100 m.p.

Installation window sill boards PVC:

10-01-035-1 at stone walls thickness up to 0.51 m.

10-01-035-2 at panel walls.

10-01-035-3 in stone walls over 0.51 m thick.

Resource ID

Cost element name

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Construction mast hoists 0.5 t

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

101-1920

Polyurethane foam sealant (mounting foam) type Markrofleks, Soudal in cylinders of 750 ml

PVC window sill boards

Plastic mounting wedges

Table GESN 10-01-047 Installation of PVC blocks in external and internal doorways

Scope of work:

01. Preparing the door block for preset in the opening

02. Installing the door frame on technological wedges in the opening and setting it in a horizontal plane.

03. The device marks in the door frame for drilling holes for dowels.

04. Removing the door frame from the opening.

05. Drilling holes for dowels.

06. Installation of the door frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges.

07. Drilling the wall for dowels using the existing holes in the door frame.

08. Installation of dowels.

09. Filling the gap between the door frame and the wall with mounting foam.

10. Arrangement of an external water-proof vapor-permeable layer (standards 1-3).

11. Arrangement of an internal vapor barrier layer (standards 1-3).

12. Installation of door fittings.

13. The device "nut".

14. Hanging sashes.

Meter: 100 m 2 openings

Installation of PVC blocks in external and internal doorways

10-01-047-1 in stone walls with an opening area of ​​up to 3 m 2

10-01-047-2 in stone walls with an opening area of ​​more than 3 m 2

10-01-047-3 balcony in stone walls

10-01-047-4 in partitions and wooden uncut walls with an opening area of ​​up to 3 m 2

10-01-047-5 in partitions and wooden uncut walls with an opening area of ​​​​more than 3 m 2

Resource ID

Cost element name

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Construction mast hoists 0.5 t

Electric drills

Construction and installation screwdrivers

Electric perforators

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

Polyurethane foam sealant (mounting foam) type Markrofleks, Soudal in cylinders of 750 ml

Mounting dowels 10x130 (10x132, 10x150) mm

Butyl tape

Diffusion butyl tape

Butyl tape PSUL

Construction screws

Plastic mounting wedges

Entrance plastic door blocks

Balcony plastic door blocks

The norms of Table GESN 10-04-011 "Establishment of partitions up to 3 m high in public buildings" should be considered invalid.(Amended Issue 4)

Table GESN 10-04-011 Installation of partitions up to 3 m high in public buildings

Scope of work:

01. Sticking sponge rubber strips to frame elements adjacent to building structures (standards 1-4).

02. Installing the metal frame of the partition.

03. Installation of gypsum boards or gypsum fiber boards with their fastening to the frame with self-tapping screws.

04. Installation mineral wool boards with fixing them with mastic applied in separate strokes on one of the internal surfaces of gypsum boards or gypsum boards (norms 3, 4).

05. Puttying the seams with pasting them with fabric tape.

06. Preparation of putty (standards 1-4).

Meter: 100 m 2 partitions minus openings

Arrangement of partitions up to 3 m high in public buildings with double-sided cladding drywall sheets <КНАУФ>:

10-04-011-5 in one layer without insulation

10-04-011-6 in two layers without insulation

Resource ID

Cost element name

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Construction hoists, cargo-passenger, load capacity up to 0.8 t

Electric drills

Construction and installation screwdrivers

Electric scissors

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

101-2031

Soundproof self-adhesive tape 50 mm

Fasteners for drywall installation: plastic dowels

PCS.

Fasteners for mounting drywall: drywall-metal screws 3.5x25

Fasteners for drywall mounting: drywall-metal screws 3.5x35

101-3275

Plasterboard sheets, standard, Knauf, 8-10 mm thick

101-3591

Tape for sealing GKL seams, serpyanka, 5 cm wide

Putty mixture "Fugenfüller"

Accessories for drywall installation: guide profile 50x40x0.55

Accessories for drywall installation: rack profile 50x50x0.55

All documents presented in the catalog are not their official publication and are for informational purposes only. Electronic copies of these documents can be distributed without any restrictions. You can post information from this site on any other site.

The system of regulatory documents in construction

ESTIMATE STANDARDS OF THE RUSSIAN FEDERATION

Rostov region

TERRITORIAL UNIT RATES

to determine the cost construction works in the Rostov region

CHANGES AND ADDITIONS
to the Territorial Unit Prices for Construction Works

TER 81-02-2001

Release 2

Part 2

Administration of the Rostov region
Rostov-on-Don 2006

Designed to determine the estimated cost of construction work performed at the sites of new construction of buildings and structures, as well as to pay for the work performed.

“Changes and additions to TER-2001 for construction work Issue 2 Part 2” were developed on the basis of the collection “Changes and additions to GESN-2001 for construction work Issue 2 Part 2”, approved and put into effect by the Decree of the Gosstroy of Russia dated March 09, 2004 No. 41.

DEVELOPED BY the Regional Center for Analysis of Pricing in Construction (OCACS) of the Rostov Region (G.A. Sergienko) with the participation of Rostovgiproshakht LLC (E.V. Rezvan), Rostovgrazhdanproekt OJSC (L.L. Kulygina)

CONSIDERED at a meeting of the commission on pricing policy in the construction of the Rostov region

APPROVED by the decision of the commissions on pricing policy in the construction of the Rostov region

REGISTERED by Gosstroy, letter No. 02-1651 dated October 27, 2006

ADOPTED AND INTRODUCED by the Ministry of Construction, Architecture and Housing and Utilities of the Rostov Region by Order No. 166 dated October 30, 2006

Collection 10 TER 81-02-10-2001
"WOODEN STRUCTURES"

Additions to rates

Table 10-01-034 Installation of window blocks made of PVC profiles in residential and public buildings

Meter: 100 m 2 openings

Rate numbers

Direct costs, rub.

Including, rub.

machine operation

materials

Codes of unaccounted materials

Total

Installation in residential and public buildings window PVC profile blocks:

10-01-034-01

deaf with an opening area of ​​​​up to 2 m 2

11571,52

1492,36

451,69

55,18

9627,47

170,75

(203-9095-1)

10-01-034-02

deaf with an opening area of ​​​​more than 2 m 2

9116,34

1201,14

426,90

43,54

7488,30

137,43

(203-9095-1)

Plastic window blocks (m 2)

10-01-034-03

rotary (folding, tilt-and-turn) with an opening area of ​​up to 2 m 2 single-leaf

15154,44

1888,54

684,65

55,18

12581,25

216,08

(203-9095-1)

Plastic window blocks (m 2)

10-01-034-04

rotary (folding, tilt-and-turn) with an opening area of ​​more than 2 m 2 single-leaf

11161,25

1410,02

527,36

43,54

9223,87

161,33

(203-9095-1)

Plastic window blocks (m 2)

10-01-034-05

rotary (folding, tilt-and-turn) with an opening area of ​​up to 2 m 2 double-leaf

12840,42

1639,19

626.39

55,18

10574,84

187,55

(203-9095-1)

Plastic window blocks (m 2)

10-01-034-06

rotary (folding, tilt-and-turn) with an opening area of ​​​​more than 2 m 2 double-leaf

9769,73

1273,59

477,74

43,54

8018,40

145,72

(203-9095-1)

Plastic window blocks (m 2)

10-01-034-07

rotary (folding, tilt-and-turn) with an opening area of ​​up to 2 m 2 three-leaf, including in the presence of blind glazing

13277,31

1698,53

619,58

55,18

10959,20

194,34

(203-9095-1)

Plastic window blocks (m 2)

10-01-034-08

pivoting (tilting, tilt-and-turn) with an opening area of ​​more than 2 m

10035,66

1303,66

490,84

43,54

8241,16

149,16

(203-9095-1)

Plastic window blocks (m 2)

Table 10-01-035 Installation of PVC window sills

Gauge: 100 m.p.

Rate numbers

Name and characteristics of construction works and structures

Direct costs, rub.

Including, rub.

Labor costs of construction workers, man-hours

construction worker wages

machine operation

materials

Codes of unaccounted materials

Name and characteristics of materials unaccounted for by prices (unit of measurement)

Total

including driver wages

consumption of unaccounted materials

Installation of window sills PVC boards:

10-01-035-01

in stone walls up to 0.51 m thick

4162,35

180,75

10,98

1,96

3970,62

21,19

(101-9468)

PVC window sill boards (m)

10-01-035-02

in panel walls

3649,45

181,35

13,89

2,47

3454,21

21,26

(101-9468)

PVC window sill boards (m)

10-01-035-03

in stone walls over 0.51 m thick

5733,12

182,37

21,76

3,81

5528,99

21,38

(101-9468)

PVC window sill boards (m)

Table 10-01-047 Installation of PVC blocks in external and internal doorways

Meter: 100 m 2 openings

Rate numbers

Name and characteristics of construction works and structures

Direct costs, rub.

Including, rub.

Labor costs of construction workers, man-hours

construction worker wages

machine operation

materials

Codes of unaccounted materials

Name and characteristics of materials unaccounted for by prices (unit of measurement)

Total

including driver wages

consumption of unaccounted materials

Installation of PVC blocks in external and internal doorways in stone walls with an opening area:

10-01-047-01

until 3 m 2

15266,89

1778,85

635,52

47,67

12852,52

201,00

(203-9057-1)

10-01-047-02

more than 3 m 2

9174,29

1091,71

430,43

42,06

7652,15

124,91

(203-9057-1)

Entrance plastic door blocks (m 2)

10-01-047-03

Installation of PVC blocks in external and internal balcony doorways in stone walls

220423,03

1923,15

647,36

54,12

217852,52

220,04

Table 10-04-011 Installation of partitions up to 3 m high in public buildings

Meter: 100 m 2 partitions minus openings

Rate numbers

Name and characteristics of construction works and structures

Direct costs, rub.

Including, rub.

Labor costs of construction workers, man-hours

construction worker wages

machine operation

materials

Codes of unaccounted materials

Name and characteristics of materials unaccounted for by prices (unit of measurement)

Total

including driver wages

consumption of unaccounted materials

Arrangement of partitions up to 3 m high in public buildings with double-sided plasterboard sheathing<КНАУФ>:

10-04-011-05

in one layer without insulation

12966,73

907,00

2890,16

570,64

9169,57

100,00

10-04-011-06

two layers without insulation

21546,15

1179,10

5228,00

1035,48

15139,05

130,00

Appendix 1. Estimated prices for the operation of construction machines and mechanisms in the basic prices of the Rostov region as of 01.01.2000.

Resource ID

Name of construction machines and mechanisms

Unit rev.

Estimated price, rub.

Incl. wages of workers operating the machine, rub.

ESTIMATED PRICES FOR THE OPERATION OF CONSTRUCTION MACHINES AND MECHANISMS

031102

Construction hoists, cargo-passenger, load capacity up to 0.8 t

mash.h/person.h

52,09

10,58

031121

Construction mast hoists 0.5 t

mash.h/person.h

19,40

10,58

330206

Electric drills

mash.h/person.h

5,46

330208

Construction and installation screwdrivers

mash.h/person.h

4,30

330901

Electric scissors

mash.h/person.h

0,66

331451

Electric perforators

mash.h/person.h

8,77

400001

Cars onboard with a carrying capacity of up to 5 tons

mash.h/person.h

68,00

10,24

Appendix 2. Estimated prices for materials, products and structures in the base prices of the Rostov region as of 01.01.2000.

Resource ID

Extended resource ID

Name

Unit rev.

Estimated price, rub.

ESTIMATED PRICES FOR MATERIAL RESOURCES

101-1920

Polyurethane foam sealant (mounting foam) type Makrofleks, Soudal in bottles of 750 ml

PCS.

45,70

101-2031

Soundproof self-adhesive tape 50 mm

0,77

101-2033

0103

Fasteners for drywall installation: plastic dowels (6×60mm)

PCS.

0,63

101-2179

Fasteners for drywall mounting: drywall-metal screws 3.5×25

1000 pcs.

44,30

101-2180

Fasteners for drywall installation: drywall-metal screws 3.5×35

1000 pcs.

63,30

101-3275

0001

Plasterboard sheets, standard, Knauf 8 mm thick

m 2

27,90

101-3591

Tape for sealing GKL seams, serpyanka 5 cm wide

100 m

45,00

101-4150

Putty mixture "Fugenfüller"

kg

5,15

101-4173

0101

Mounting dowels 10×130 mm

10 pieces.

30,96

101-9112

Plastic mounting wedges

PCS.

1,73

101-9452

0101

Butyl tape 4×0.25

0,71

101-9453

0101

Diffusion butyl tape 80 mm wide

6,92

101-9454

0101

Butyl tape PSUL Robiband. 15/40

11,00

101-9680

Construction screws

12417,00

201-8116

Accessories for drywall installation: guide profile 50×40×0.55

8,76

201-8132

Accessories for drywall installation: rack profile 50×50×0.55

10,80

203-9122

Balcony plastic door blocks

m 2

2050,00

Appendix 3. Codes of materials used in the prices of TER 81-02-10-2001 instead of the general codes of GESN 81-02-10-2001

No. of tables and prices

GESN resource code

Code of resources used in TER

10-04-011-054÷06

101-2033

101-2033-0103

10-04-011-054÷06

101-3275

101-3275-0001

10-01-034-01÷08

10-01-047-01÷03

101-4173

101-4173-0101

10-01-034-01÷08

10-01-047-01÷03

101-9452

101-9452-0101

10-01-034-01÷08

10-01-047-01÷03

101-9453

Adjustment of prices 10-01-034-01 - 10-01-034-08 for the installation of PVC window blocks

The prices 10-01-034-0110-01-034-08 for the installation of PVC window blocks take into account the consumption rate of sealant (mounting foam) per 100 m of windows - 1.79 cylinders. those. for about 40 window blocks - 1.79 cylinders. Will these prices be adjusted or do you think that these norms correspond to reality and technology?

Yes, these standards have now been adjusted and are listed below. However, it should be noted that the consumption of mounting foam is determined based on the mounting gaps allowed by the standards.

Collection of ESN 2001-10 " wooden structures"

Technical part

In the norms, it is customary to fasten the blocks with dowels. For other types of fastening blocks, the norms are not adjusted. The consumption of mounting dowels can be specified according to the design and actual data.

4. WINDOWS

Scope of work:

01. Preparation of window blocks for pre-installation in the opening (removal of sashes; in places of blind glazing - removal of glazing beads and double-glazed windows; with outer side- withdrawal protective film). 02. Installing the window frame on technological wedges in the opening and setting it in a horizontal plane. 03. Device on the box of marks for drilling holes for dowels in places of mortgages wooden corks. 04. Removing the window frame from the opening. 05. Drilling holes for dowels (from outside to inside the box). 06. Installation of a window frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges. 07. Drilling the wall for dowels using the existing holes in the balcony door frame. 08. Installation of dowels (when tightening, use screwdrivers with calibrated torque). 09. Filling the gap between window block and wall mounting foam. 10. Installation of self-expanding insulating, vapor barrier and water barrier tapes. 11. Installation of double-glazed windows and fastening of glazing beads (in places of blind glazing), hinged sashes.

Gauge: 100 m openings

Installation of PVC profile windows

10-01-034-01

10-01-034-02

10-01-034-03

10-01-034-04

10-01-034-05

10-01-034-06

10-01-034-07

10-01-034-08


Resource ID

Cost element name

Unit meas.

10-01-034-01

10-01-034-02

10-01-034-03

10-01-034-04

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Electric perforators

MATERIALS

101-9101-003

101-9459-003

Vapor barrier tape

101-9459-005

101-1921-001

balloon

Resource ID

Cost element name

Unit meas.

10-01-034-05

10-01-034-06

10-01-034-07

10-01-034-08

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction 6.3 t

Construction mast hoists 0.5 t

Electric perforators

Construction and installation screwdrivers

MATERIALS

Polyvinylchloride window blocks (PVC)

101-9101-003

Mounting dowels 10x130 (10x132, 10x150) mm

101-9459-003

Insulating butyl tape PSUL

Vapor barrier tape

101-9459-005

Diffusion waterproof tape

101-1921-001

Polyurethane foam sealant (mounting foam) type Makroflekx, Soudal in cylinders of 750 ml

balloon

Wooden wedges (including turnover)

5. DOORS, GATES

Scope of work:

For norms 5-6: 04. Preparing the balcony door block for pre-installation in the opening (removing the leaves; from the outside, removing the protective film). 05. Installing the balcony door frame on technological wedges in the opening and setting it in a horizontal plane. 06. Device on the box of marks for drilling holes for dowels in places of embedded wooden plugs. 07. Removing the balcony door frame from the opening. 08. Drilling holes for dowels (from outside to inside the box). 09. Installation of the balcony door frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges. 10. Drilling the wall for dowels using the existing holes in the balcony door frame. 11. Installation of dowels (when tightening, use screwdrivers with calibrated torque). 12. Connection of balcony door and window frames with self-tapping screws. 13. Filling the gap between the door frame and the wall with mounting foam. 14. Installation of self-expanding insulating, vapor barrier and water barrier tapes. 15. Hinge of shutters.

Gauge: 100 m openings

Resource ID

Cost element name

Unit meas.

10-01-041-5

10-01-041-6

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction 6.3 t

Construction mast hoists 0.5 t

Electric perforators

Construction and installation screwdrivers

MATERIALS


101-1921-001

Polyurethane foam sealant (mounting foam) type Makroflekx, Soudal in cylinders of 750 ml

balloon

101-9459-003

Insulating butyl tape PSUL

Vapor barrier tape

Diffusion waterproof tape

screws with countersunk head

Wooden wedges (including turnover)

4. WINDOWS

NN
rates

Unit
change
rhenium

Direct costs, rub.

Including, rub.


(Codes of unaccounted materials)


wages of construction workers
tellers

machine operation

materials

including machine wages
nists

consumption of unaccounted materials

Table 10-01-034

Gauge: 100 m openings

Installation of PVC profile windows

10-01-034-1

deaf with opening area up to 2 m

Polyvinylchloride window blocks (PVC)

10-01-034-2

deaf with an opening area of ​​​​more than 2 m

Polyvinylchloride window blocks (PVC)

10-01-034-3

rotary (folding, tilt-and-turn) with an opening area of ​​up to 2 m single-leaf

Polyvinylchloride window blocks (PVC)

10-01-034-4

rotary (folding, tilt-and-turn) with an opening area of ​​more than 2 m single-leaf

Polyvinylchloride window blocks (PVC)

10-01-034-5

rotary (folding, tilt-and-turn) with an opening area of ​​up to 2 m double-leaf

Polyvinylchloride window blocks (PVC)

10-01-034-6

rotary (folding, tilt-and-turn) with an opening area of ​​more than 2 m double-leaf

Polyvinylchloride window blocks (PVC)

10-01-034-7

pivoting (folding, tilt-and-turn) with an opening area of ​​up to 2 m three-leaf, including in the presence of blind glazing

Polyvinylchloride window blocks (PVC)

10-01-034-8

pivoting (tilting, tilt-and-turn) with an opening area of ​​more than 2 m

Polyvinylchloride window blocks (PVC)

5. DOORS, GATES

Table 10-01-041

Filling balcony openings in the stone walls of residential and public buildings door blocks wooden and PVC profiles

Gauge: 100 m openings

Filling balcony openings in the stone walls of residential and public buildings with PVC door blocks:

10-01-041-5

opening area up to 3 m

PVC balcony door blocks

10-01-041-6

opening area more than 3 m

PVC balcony door blocks

ESTIMATED PRICES FOR THE OPERATION OF CONSTRUCTION
MACHINERY AND ESTIMATE PRICES FOR MATERIALS, PRODUCTS AND STRUCTURES
IN BASIC PRICES AS OF 01/01/2000

OPERATION OF CONSTRUCTION MACHINES

Name

Unit rev.

Price without VAT, rub.

estimated cost per machine-hour

including driver wages

Truck-mounted cranes when working on other types of construction (except main pipelines) 6.3 t

Construction mast hoists 0.5 t

Construction and installation screwdrivers

Electric perforators

Cars onboard with a carrying capacity of up to 5 tons

ESTIMATED PRICES FOR MATERIAL RESOURCES

Name

Unit rev.

Price without VAT, rub.

Mounting foam for sealing joints in a 0.75 l can

101-9101-003

Mounting dowels 10x130 (10x132, 10x150) mm

101-9228-008

Countersunk screws 6x55 mm

101-9459-003

Insulating butyl pre-compressed sealing tape (PSUL)

101-9459-004

Vapor barrier tape

101-9459-005

Diffusion waterproofing tape

Wooden wedges

Collection TER 2001-10 St. Petersburg "Wooden structures"

NN
rates

Name and characteristics of construction works and structures (equipment)

Unit
change
rhenium

Direct costs, rub.

Including, rub.

Labor costs of construction workers man-hour

(Codes of unaccounted materials)

Name and characteristics of materials unaccounted for by prices

wages of construction workers
tellers

machine operation

materials

including machine wages
nists

consumption of unaccounted materials

Table 10-01-034

Installation of window blocks made of PVC profiles in the stone walls of residential and public buildings

Gauge: 100 m openings

Installation of PVC profile windows

10-01-034-1

deaf with opening area up to 2 m

Polyvinylchloride window blocks (PVC)

10-01-034-2

deaf with an opening area of ​​​​more than 2 m

Polyvinylchloride window blocks (PVC)

Table GESN 10-01-039 Installation of blocks

Scope of work:

01. Retarding and upholstery of boxes with roofing paper (standards 1, 2, 5). 02. Installation of blocks. 03. Installation of platbands (standards 3, 4). 04. Installation of devices.

Meter: 100 m 2 openings

Installation of blocks in external and internal doorways:

Resource ID

Unit meas.

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

MATERIALS

Door blocks

Manholes and hatches

Hardware

set

lumber conifers. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III

Ready-made finishing mortar, heavy, calcareous 1:2.0

Building nails

Metal ruffs

Gypsum binders G-3

Tow impregnated

platbands

Construction screws

Table GESN 10-01-040 Filling of external and internal doorways separate elements in wooden chopped walls

Scope of work:

01. Installation of boxes with nailing of vertical bars to form a ridge, sampling a groove in the ends of the bars (logs). 02. Fitting and hanging door panels with the installation of appliances. 03. Installation of platbands.

Meter: 100 m 2 openings

Filling of external and internal doorways with separate elements in wooden chopped walls with an opening area:

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

Door frames

Cloths for door blocks

Hardware

set

Softwood lumber. Edged boards 4-6.5 m long, 75‑150 mm wide, 25 mm thick, grade III

platbands

Building nails

Metal ruffs

Flashing 34×13 mm

Table GESN 10-01-041 Filling balcony openings in the stone walls of residential and public buildings with blocks

Scope of work:

01. Installation of blocks with resin and roofing upholstery. 02. Caulking of boxes with tow, coating with a solution. 03. Installation of overhead devices.

Meter: 100 m 2 openings

Filling balcony openings in the stone walls of residential and public buildings with door blocks with leafs:

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Tower cranes when working on other types of construction (except for installation technological equipment) 8 t

Mobile bitumen boilers 400 l

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t

Construction and installation screwdrivers

MATERIALS

Balcony door blocks

Hardware

set

Tow impregnated

Roofing with coarse-grained dressing waterproofing brand TG-350

Coal tar for road construction

Building nails

Construction screws

Gypsum binders G-3

Roofing felt nails round 3.0×40 mm

Table GESN 10-01-042 Filling balcony openings in wooden chopped walls with blocks

Scope of work:

01. Installing blocks with nailing vertical bars to boxes to form a ridge, cutting a groove in the ends of the bars (logs). 02. Caulking boxes. 03. Installation of platbands. 04. Installation of overhead devices.

Meter: 100 m 2 openings

Filling balcony openings in wooden chopped walls with door blocks with leafs:

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Construction and installation screwdrivers

MATERIALS

Balcony door blocks

Hardware

set

Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III

platbands

Tow impregnated

Building nails

Construction screws

Table GESN 10-01-043 Installation of boxes in wooden walls

Scope of work:

01. Installation of boxes (standards 1-8). 02. Nailing vertical bars to the boxes to form a ridge, making a groove in the ends of the bars (logs) (standards 1-4). 03. Installation of spacer boards in door frames (standards 3, 4, 7, 8). 04. Installation of platbands.

Meter: 100 m 2 openings

Installing boxes in wooden walls:

chopped in window openings up to 2 m 2

chopped in window openings with an area of ​​​​more than 2 m 2

chopped in doorways up to 3 m 2

chopped in doorways with an area of ​​​​more than 3 m 2

uncut in window openings up to 2 m 2

uncut in window openings with an area of ​​​​more than 2 m 2

not chopped in doorways up to 3 m 2

not chopped in doorways with an area of ​​​​more than 3 m 2

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

Door frames

Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III

platbands

Building nails

Sodium fluoride technical, brand A, grade I

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

Door frames

platbands

Building nails

Metal ruffs

Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 32-40 mm thick, grade III

Sodium fluoride technical, brand A, grade I

Table GESN 10-01-044 Door upholstery

Scope of work:

01. Upholstery of door panels and frames roofing steel on wood (standards 5, 6, 11, 12) with lining of felt impregnated with clay mortar (standards 1, 2, 7, 8), asbestos cardboard (standards 3, 4, 9, 10). 02. Drying of roofing steel (standards 1-6).

Meter: 100 m 2 openings

Upholstery of doors with non-galvanized roofing steel:

on felt on both sides

on felt on one side

on asbestos from both sides

on asbestos on one side

wood on both sides

wood on one side

Upholstery of doors with galvanized roofing steel:

on felt on both sides

on felt on one side

on asbestos from both sides

on asbestos on one side

wood on both sides

wood on one side

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t

MATERIALS

Construction felt

Roofing felt nails round 3.0×40 mm

Drying oil natural

Pigment grated

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t

MATERIALS

Roofing steel STK-1 sheet thickness 0.50 mm

Roofing felt nails round 3.0×40 mm

Drying oil natural

Pigment grated

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t

MATERIALS

Construction felt

Roofing felt nails round 3.0×40 mm

Asbestos cardboard general purpose(KAON-1) 4 and 6 mm thick

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t

MATERIALS

Steel galvanized sheet thickness sheet 0.50 mm

Roofing felt nails round 3.0×40 mm

Table GESN 10-01-045 Additional caulk door frames tow in the outer walls

Scope of work:

01. Preparation of gypsum mortar by wetting tow (standards 1-2). 02. Caulking boxes.

Meter: 100 m 2 openings

Caulk of door frames with tow in the outer walls:

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Cars onboard with a carrying capacity of up to 5 tons

MATERIALS

Gypsum binders G-3

Tow impregnated

Table GESN 10-01-046 Gate installation

Scope of work:

01. Framing of openings with steel parts (standard 1). 02. Installation wooden boxes(norm 2). 03. Installation of canvases. 04. Installation of forgings and devices.

Meter: 100 m 2 canvases and openings

Resource ID

Name of cost elements

Unit meas.

Labor costs of construction workers

Average work grade

Machinist labor costs

MACHINES AND MECHANISMS

Crawler cranes when working on other types of construction (except for main pipelines) up to 16 tons

Manual Arc Welding Machines (DC)

Cars onboard with a carrying capacity of up to 5 tons

Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t

Construction and installation screwdrivers

Mobile bitumen boilers 400 l

MATERIALS

Swing gates

Hardware

set

Hot-rolled thin sheets in sheets with cut edges with a width of more than 1200 to 1300 mm, a thickness of 3.2-3.9 mm, steel grade C235

Sliding gate frames, swing lifting gates, up-and-over

Steel strip calm grade St3sp, 50-200 mm wide, 4-5 mm thick

Building nails

Drying oil natural

Earthen oil paints MA-0115: mummy, iron minium

Pressed rubber

Construction screws

Construction bolts with nuts and washers

Electrodes with a diameter of 6 mm E42

Window boxes

Roofing with coarse-grained dressing waterproofing brand TG-350

Sheet glass up to 1.0 m2, 1 group, 2 mm thick, grade M1

Metal ruffs

Coal tar for road construction