Installation of pvc-profile window blocks in the stone walls of residential and public buildings. Installation in the stone walls of residential and public buildings of window blocks made of PVC profiles Gasn 10 05 001 02 scope of work
Collection #10
WOODEN STRUCTURES
GESN-2001-10
ADDITIONS TO REGULATIONS
Table GESN 10-01-034 Installation of window blocks made of PVC profiles in residential and public buildings
Scope of work:
01. Preparing the frame for pre-installation in the opening.
02. Installing the frame on technological wedges in the opening and setting it in a horizontal plane.
03. Device on the frame of marks for drilling holes for the dowel.
04. Removing the frame.
05. Drilling holes for dowels (from outside to inside the frame).
06. Installation of the frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges.
07. Drilling the wall for dowels using the existing holes.
08. Installation of dowels.
09. Filling the gap between the frame and the wall mounting foam.
10. Installation of double-glazed windows.
11. The device of the outer water-proof vapor-permeable layer.
12. The device of the internal vapor barrier layer.
13. Installation of fittings.
Meter: 100 m 2 openings
Installation of window blocks made of PVC profiles in residential and public buildings:
10-01-034-1 deaf with an opening area of up to 2 m 2
10-01-034-2 deaf with an opening area of more than 2 m 2
10-01-034-3 swivel (folding, tilt-and-turn) with an opening area of up to 2 m 2 single-leaf
10-01-034-4 rotary (folding, tilt-and-turn) with an opening area of more than 2 m 2
single leaf
10-01-034-5 rotary (folding, tilt-and-turn) with opening area up to 2 m 2
bivalve
10-01-034-6 swivel (folding, tilt-and-turn) with an opening area of more than 2 m 2 double-leaf
10-01-034-7 rotary (folding, tilt-and-turn) with an opening area of up to 2 m 2 three-leaf, including in the presence of fixed glazing leaves
10-01-034-8 swivel (tilt, tilt-and-turn) with an opening area of more than 2 m2 three-leaf, including in the presence of fixed glazing sashes
Resource ID |
Cost element name |
Unit meas. |
||||
Average work grade |
||||||
Machinist labor costs |
||||||
MACHINES AND MECHANISMS |
||||||
Electric perforators |
||||||
MATERIALS |
||||||
Polyurethane foam sealant (mounting foam) type Markrofleks, Soudal in cylinders of 750 ml |
||||||
Butyl tape |
||||||
Diffusion butyl tape |
||||||
Butyl tape PSUL |
||||||
Plastic mounting wedges |
||||||
Plastic window blocks |
Resource ID |
Cost element name |
Unit meas. |
||||
Labor costs of construction workers |
||||||
Average work grade |
||||||
Machinist labor costs |
||||||
MACHINES AND MECHANISMS |
||||||
Construction mast hoists 0.5 t |
||||||
Construction and installation screwdrivers |
||||||
Electric perforators |
||||||
Cars onboard with a carrying capacity of up to 5 tons |
||||||
MATERIALS |
||||||
Mounting dowels 10x130 (10x132, 10x150) mm |
||||||
Butyl tape |
||||||
Diffusion butyl tape |
||||||
Butyl tape PSUL |
||||||
Plastic mounting wedges |
||||||
Plastic window blocks |
Table GESN 10-01-035 Installation of PVC window sills
Scope of work:
01. Inserting a window sill into the window sill groove of the window block with leveling.
02. Fixing the window sill with wedges.
03. Treatment of seams and voids with foam.
Gauge: 100 m.p.
Installation window sill boards PVC:
10-01-035-1 at stone walls thickness up to 0.51 m.
10-01-035-2 at panel walls.
10-01-035-3 in stone walls over 0.51 m thick.
Resource ID |
Cost element name |
Unit meas. |
|||
Labor costs of construction workers |
|||||
Average work grade |
|||||
Machinist labor costs |
|||||
MACHINES AND MECHANISMS |
|||||
Construction mast hoists 0.5 t |
|||||
Cars onboard with a carrying capacity of up to 5 tons |
|||||
MATERIALS |
|||||
101-1920 |
Polyurethane foam sealant (mounting foam) type Markrofleks, Soudal in cylinders of 750 ml |
||||
PVC window sill boards |
|||||
Plastic mounting wedges |
Table GESN 10-01-047 Installation of PVC blocks in external and internal doorways
Scope of work:
01. Preparing the door block for preset in the opening
02. Installing the door frame on technological wedges in the opening and setting it in a horizontal plane.
03. The device marks in the door frame for drilling holes for dowels.
04. Removing the door frame from the opening.
05. Drilling holes for dowels.
06. Installation of the door frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges.
07. Drilling the wall for dowels using the existing holes in the door frame.
08. Installation of dowels.
09. Filling the gap between the door frame and the wall with mounting foam.
10. Arrangement of an external water-proof vapor-permeable layer (standards 1-3).
11. Arrangement of an internal vapor barrier layer (standards 1-3).
12. Installation of door fittings.
13. The device "nut".
14. Hanging sashes.
Meter: 100 m 2 openings
Installation of PVC blocks in external and internal doorways
10-01-047-1 in stone walls with an opening area of up to 3 m 2
10-01-047-2 in stone walls with an opening area of more than 3 m 2
10-01-047-3 balcony in stone walls
10-01-047-4 in partitions and wooden uncut walls with an opening area of up to 3 m 2
10-01-047-5 in partitions and wooden uncut walls with an opening area of more than 3 m 2
Resource ID |
Cost element name |
Unit meas. |
|||||
Labor costs of construction workers |
|||||||
Average work grade |
|||||||
Machinist labor costs |
|||||||
MACHINES AND MECHANISMS |
|||||||
Construction mast hoists 0.5 t |
|||||||
Electric drills |
|||||||
Construction and installation screwdrivers |
|||||||
Electric perforators |
|||||||
Cars onboard with a carrying capacity of up to 5 tons |
|||||||
MATERIALS |
|||||||
Polyurethane foam sealant (mounting foam) type Markrofleks, Soudal in cylinders of 750 ml |
|||||||
Mounting dowels 10x130 (10x132, 10x150) mm |
|||||||
Butyl tape |
|||||||
Diffusion butyl tape |
|||||||
Butyl tape PSUL |
|||||||
Construction screws |
|||||||
Plastic mounting wedges |
|||||||
Entrance plastic door blocks |
|||||||
Balcony plastic door blocks |
The norms of Table GESN 10-04-011 "Establishment of partitions up to 3 m high in public buildings" should be considered invalid.(Amended Issue 4)
Table GESN 10-04-011 Installation of partitions up to 3 m high in public buildings
Scope of work:
01. Sticking sponge rubber strips to frame elements adjacent to building structures (standards 1-4).
02. Installing the metal frame of the partition.
03. Installation of gypsum boards or gypsum fiber boards with their fastening to the frame with self-tapping screws.
04. Installation mineral wool boards with fixing them with mastic applied in separate strokes on one of the internal surfaces of gypsum boards or gypsum boards (norms 3, 4).
05. Puttying the seams with pasting them with fabric tape.
06. Preparation of putty (standards 1-4).
Meter: 100 m 2 partitions minus openings
Arrangement of partitions up to 3 m high in public buildings with double-sided cladding drywall sheets <КНАУФ>:
10-04-011-5 in one layer without insulation
10-04-011-6 in two layers without insulation
Resource ID |
Cost element name |
Unit meas. |
||
Labor costs of construction workers |
||||
Average work grade |
||||
Machinist labor costs |
||||
MACHINES AND MECHANISMS |
||||
Construction hoists, cargo-passenger, load capacity up to 0.8 t |
||||
Electric drills |
||||
Construction and installation screwdrivers |
||||
Electric scissors |
||||
Cars onboard with a carrying capacity of up to 5 tons |
||||
MATERIALS |
||||
101-2031 |
Soundproof self-adhesive tape 50 mm |
|||
Fasteners for drywall installation: plastic dowels |
PCS. |
|||
Fasteners for mounting drywall: drywall-metal screws 3.5x25 |
||||
Fasteners for drywall mounting: drywall-metal screws 3.5x35 |
||||
101-3275 |
Plasterboard sheets, standard, Knauf, 8-10 mm thick |
|||
101-3591 |
Tape for sealing GKL seams, serpyanka, 5 cm wide |
|||
Putty mixture "Fugenfüller" |
||||
Accessories for drywall installation: guide profile 50x40x0.55 |
||||
Accessories for drywall installation: rack profile 50x50x0.55 |
All documents presented in the catalog are not their official publication and are for informational purposes only. Electronic copies of these documents can be distributed without any restrictions. You can post information from this site on any other site.
The system of regulatory documents in construction
ESTIMATE STANDARDS OF THE RUSSIAN FEDERATION
Rostov region
TERRITORIAL UNIT RATES
to determine the cost construction works in the Rostov region
CHANGES AND ADDITIONS
to the Territorial Unit Prices for Construction Works
TER 81-02-2001
Release 2
Part 2
Administration of the Rostov region
Rostov-on-Don 2006
Designed to determine the estimated cost of construction work performed at the sites of new construction of buildings and structures, as well as to pay for the work performed.
“Changes and additions to TER-2001 for construction work Issue 2 Part 2” were developed on the basis of the collection “Changes and additions to GESN-2001 for construction work Issue 2 Part 2”, approved and put into effect by the Decree of the Gosstroy of Russia dated March 09, 2004 No. 41.
DEVELOPED BY the Regional Center for Analysis of Pricing in Construction (OCACS) of the Rostov Region (G.A. Sergienko) with the participation of Rostovgiproshakht LLC (E.V. Rezvan), Rostovgrazhdanproekt OJSC (L.L. Kulygina)
CONSIDERED at a meeting of the commission on pricing policy in the construction of the Rostov region
APPROVED by the decision of the commissions on pricing policy in the construction of the Rostov region
REGISTERED by Gosstroy, letter No. 02-1651 dated October 27, 2006
ADOPTED AND INTRODUCED by the Ministry of Construction, Architecture and Housing and Utilities of the Rostov Region by Order No. 166 dated October 30, 2006
Collection 10 TER 81-02-10-2001
"WOODEN STRUCTURES"
Additions to rates
Table 10-01-034 Installation of window blocks made of PVC profiles in residential and public buildings
Meter: 100 m 2 openings
Rate numbers |
Direct costs, rub. |
Including, rub. |
|||||
machine operation |
materials |
||||||
Codes of unaccounted materials |
Total |
||||||
Installation in residential and public buildings window PVC profile blocks: |
|||||||
10-01-034-01 |
deaf with an opening area of up to 2 m 2 |
11571,52 |
1492,36 |
451,69 |
55,18 |
9627,47 |
170,75 |
(203-9095-1) |
|||||||
10-01-034-02 |
deaf with an opening area of more than 2 m 2 |
9116,34 |
1201,14 |
426,90 |
43,54 |
7488,30 |
137,43 |
(203-9095-1) |
Plastic window blocks (m 2) |
||||||
10-01-034-03 |
rotary (folding, tilt-and-turn) with an opening area of up to 2 m 2 single-leaf |
15154,44 |
1888,54 |
684,65 |
55,18 |
12581,25 |
216,08 |
(203-9095-1) |
Plastic window blocks (m 2) |
||||||
10-01-034-04 |
rotary (folding, tilt-and-turn) with an opening area of more than 2 m 2 single-leaf |
11161,25 |
1410,02 |
527,36 |
43,54 |
9223,87 |
161,33 |
(203-9095-1) |
Plastic window blocks (m 2) |
||||||
10-01-034-05 |
rotary (folding, tilt-and-turn) with an opening area of up to 2 m 2 double-leaf |
12840,42 |
1639,19 |
626.39 |
55,18 |
10574,84 |
187,55 |
(203-9095-1) |
Plastic window blocks (m 2) |
||||||
10-01-034-06 |
rotary (folding, tilt-and-turn) with an opening area of more than 2 m 2 double-leaf |
9769,73 |
1273,59 |
477,74 |
43,54 |
8018,40 |
145,72 |
(203-9095-1) |
Plastic window blocks (m 2) |
||||||
10-01-034-07 |
rotary (folding, tilt-and-turn) with an opening area of up to 2 m 2 three-leaf, including in the presence of blind glazing |
13277,31 |
1698,53 |
619,58 |
55,18 |
10959,20 |
194,34 |
(203-9095-1) |
Plastic window blocks (m 2) |
||||||
10-01-034-08 |
pivoting (tilting, tilt-and-turn) with an opening area of more than 2 m |
10035,66 |
1303,66 |
490,84 |
43,54 |
8241,16 |
149,16 |
(203-9095-1) |
Plastic window blocks (m 2) |
Table 10-01-035 Installation of PVC window sills
Gauge: 100 m.p.
Rate numbers |
Name and characteristics of construction works and structures |
Direct costs, rub. |
Including, rub. |
Labor costs of construction workers, man-hours |
|||
construction worker wages |
machine operation |
materials |
|||||
Codes of unaccounted materials |
Name and characteristics of materials unaccounted for by prices (unit of measurement) |
Total |
including driver wages |
consumption of unaccounted materials |
|||
Installation of window sills PVC boards: |
|||||||
10-01-035-01 |
in stone walls up to 0.51 m thick |
4162,35 |
180,75 |
10,98 |
1,96 |
3970,62 |
21,19 |
(101-9468) |
PVC window sill boards (m) |
||||||
10-01-035-02 |
in panel walls |
3649,45 |
181,35 |
13,89 |
2,47 |
3454,21 |
21,26 |
(101-9468) |
PVC window sill boards (m) |
||||||
10-01-035-03 |
in stone walls over 0.51 m thick |
5733,12 |
182,37 |
21,76 |
3,81 |
5528,99 |
21,38 |
(101-9468) |
PVC window sill boards (m) |
Table 10-01-047 Installation of PVC blocks in external and internal doorways
Meter: 100 m 2 openings
Rate numbers |
Name and characteristics of construction works and structures |
Direct costs, rub. |
Including, rub. |
Labor costs of construction workers, man-hours |
|||
construction worker wages |
machine operation |
materials |
|||||
Codes of unaccounted materials |
Name and characteristics of materials unaccounted for by prices (unit of measurement) |
Total |
including driver wages |
consumption of unaccounted materials |
|||
Installation of PVC blocks in external and internal doorways in stone walls with an opening area: |
|||||||
10-01-047-01 |
until 3 m 2 |
15266,89 |
1778,85 |
635,52 |
47,67 |
12852,52 |
201,00 |
(203-9057-1) |
|||||||
10-01-047-02 |
more than 3 m 2 |
9174,29 |
1091,71 |
430,43 |
42,06 |
7652,15 |
124,91 |
(203-9057-1) |
Entrance plastic door blocks (m 2) |
||||||
10-01-047-03 |
Installation of PVC blocks in external and internal balcony doorways in stone walls |
220423,03 |
1923,15 |
647,36 |
54,12 |
217852,52 |
220,04 |
Table 10-04-011 Installation of partitions up to 3 m high in public buildings
Meter: 100 m 2 partitions minus openings
Rate numbers |
Name and characteristics of construction works and structures |
Direct costs, rub. |
Including, rub. |
Labor costs of construction workers, man-hours |
|||
construction worker wages |
machine operation |
materials |
|||||
Codes of unaccounted materials |
Name and characteristics of materials unaccounted for by prices (unit of measurement) |
Total |
including driver wages |
consumption of unaccounted materials |
|||
Arrangement of partitions up to 3 m high in public buildings with double-sided plasterboard sheathing<КНАУФ>: |
|||||||
10-04-011-05 |
in one layer without insulation |
12966,73 |
907,00 |
2890,16 |
570,64 |
9169,57 |
100,00 |
10-04-011-06 |
two layers without insulation |
21546,15 |
1179,10 |
5228,00 |
1035,48 |
15139,05 |
130,00 |
Appendix 1. Estimated prices for the operation of construction machines and mechanisms in the basic prices of the Rostov region as of 01.01.2000.
Resource ID |
Name of construction machines and mechanisms |
Unit rev. |
Estimated price, rub. |
Incl. wages of workers operating the machine, rub. |
ESTIMATED PRICES FOR THE OPERATION OF CONSTRUCTION MACHINES AND MECHANISMS |
||||
031102 |
Construction hoists, cargo-passenger, load capacity up to 0.8 t |
mash.h/person.h |
52,09 |
10,58 |
031121 |
Construction mast hoists 0.5 t |
mash.h/person.h |
19,40 |
10,58 |
330206 |
Electric drills |
mash.h/person.h |
5,46 |
|
330208 |
Construction and installation screwdrivers |
mash.h/person.h |
4,30 |
|
330901 |
Electric scissors |
mash.h/person.h |
0,66 |
|
331451 |
Electric perforators |
mash.h/person.h |
8,77 |
|
400001 |
Cars onboard with a carrying capacity of up to 5 tons |
mash.h/person.h |
68,00 |
10,24 |
Appendix 2. Estimated prices for materials, products and structures in the base prices of the Rostov region as of 01.01.2000.
Resource ID |
Extended resource ID |
Name |
Unit rev. |
Estimated price, rub. |
ESTIMATED PRICES FOR MATERIAL RESOURCES |
||||
101-1920 |
Polyurethane foam sealant (mounting foam) type Makrofleks, Soudal in bottles of 750 ml |
PCS. |
45,70 |
|
101-2031 |
Soundproof self-adhesive tape 50 mm |
0,77 |
||
101-2033 |
0103 |
Fasteners for drywall installation: plastic dowels (6×60mm) |
PCS. |
0,63 |
101-2179 |
Fasteners for drywall mounting: drywall-metal screws 3.5×25 |
1000 pcs. |
44,30 |
|
101-2180 |
Fasteners for drywall installation: drywall-metal screws 3.5×35 |
1000 pcs. |
63,30 |
|
101-3275 |
0001 |
Plasterboard sheets, standard, Knauf 8 mm thick |
m 2 |
27,90 |
101-3591 |
Tape for sealing GKL seams, serpyanka 5 cm wide |
100 m |
45,00 |
|
101-4150 |
Putty mixture "Fugenfüller" |
kg |
5,15 |
|
101-4173 |
0101 |
Mounting dowels 10×130 mm |
10 pieces. |
30,96 |
101-9112 |
Plastic mounting wedges |
PCS. |
1,73 |
|
101-9452 |
0101 |
Butyl tape 4×0.25 |
0,71 |
|
101-9453 |
0101 |
Diffusion butyl tape 80 mm wide |
6,92 |
|
101-9454 |
0101 |
Butyl tape PSUL Robiband. 15/40 |
11,00 |
|
101-9680 |
Construction screws |
12417,00 |
||
201-8116 |
Accessories for drywall installation: guide profile 50×40×0.55 |
8,76 |
||
201-8132 |
Accessories for drywall installation: rack profile 50×50×0.55 |
10,80 |
||
203-9122 |
Balcony plastic door blocks |
m 2 |
2050,00 |
Appendix 3. Codes of materials used in the prices of TER 81-02-10-2001 instead of the general codes of GESN 81-02-10-2001
No. of tables and prices |
GESN resource code |
Code of resources used in TER |
10-04-011-054÷06 |
101-2033 |
101-2033-0103 |
10-04-011-054÷06 |
101-3275 |
101-3275-0001 |
10-01-034-01÷08 10-01-047-01÷03 |
101-4173 |
101-4173-0101 |
10-01-034-01÷08 10-01-047-01÷03 |
101-9452 |
101-9452-0101 |
10-01-034-01÷08 10-01-047-01÷03 |
101-9453 |
Adjustment of prices 10-01-034-01 - 10-01-034-08 for the installation of PVC window blocks
The prices 10-01-034-0110-01-034-08 for the installation of PVC window blocks take into account the consumption rate of sealant (mounting foam) per 100 m of windows - 1.79 cylinders. those. for about 40 window blocks - 1.79 cylinders. Will these prices be adjusted or do you think that these norms correspond to reality and technology?
Yes, these standards have now been adjusted and are listed below. However, it should be noted that the consumption of mounting foam is determined based on the mounting gaps allowed by the standards.
Collection of ESN 2001-10 " wooden structures"
Technical part
In the norms, it is customary to fasten the blocks with dowels. For other types of fastening blocks, the norms are not adjusted. The consumption of mounting dowels can be specified according to the design and actual data.
4. WINDOWS
Scope of work:
01. Preparation of window blocks for pre-installation in the opening (removal of sashes; in places of blind glazing - removal of glazing beads and double-glazed windows; with outer side- withdrawal protective film). 02. Installing the window frame on technological wedges in the opening and setting it in a horizontal plane. 03. Device on the box of marks for drilling holes for dowels in places of mortgages wooden corks. 04. Removing the window frame from the opening. 05. Drilling holes for dowels (from outside to inside the box). 06. Installation of a window frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges. 07. Drilling the wall for dowels using the existing holes in the balcony door frame. 08. Installation of dowels (when tightening, use screwdrivers with calibrated torque). 09. Filling the gap between window block and wall mounting foam. 10. Installation of self-expanding insulating, vapor barrier and water barrier tapes. 11. Installation of double-glazed windows and fastening of glazing beads (in places of blind glazing), hinged sashes.
Gauge: 100 m openings
Installation of PVC profile windows |
|
10-01-034-01 |
|
10-01-034-02 |
|
10-01-034-03 |
|
10-01-034-04 |
|
10-01-034-05 |
|
10-01-034-06 |
|
10-01-034-07 |
|
10-01-034-08 |
|
Resource ID |
Cost element name |
Unit meas. |
10-01-034-01 |
10-01-034-02 |
10-01-034-03 |
10-01-034-04 |
Average work grade |
||||||
Machinist labor costs |
||||||
MACHINES AND MECHANISMS |
||||||
Electric perforators |
||||||
MATERIALS |
||||||
101-9101-003 |
||||||
101-9459-003 |
||||||
Vapor barrier tape |
||||||
101-9459-005 |
||||||
101-1921-001 |
balloon |
|||||
Resource ID |
Cost element name |
Unit meas. |
10-01-034-05 |
10-01-034-06 |
10-01-034-07 |
10-01-034-08 |
Labor costs of construction workers |
||||||
Average work grade |
||||||
Machinist labor costs |
||||||
MACHINES AND MECHANISMS |
||||||
Cars onboard with a carrying capacity of up to 5 tons |
||||||
Truck-mounted cranes when working on other types of construction 6.3 t |
||||||
Construction mast hoists 0.5 t |
||||||
Electric perforators |
||||||
Construction and installation screwdrivers |
||||||
MATERIALS |
||||||
Polyvinylchloride window blocks (PVC) |
||||||
101-9101-003 |
Mounting dowels 10x130 (10x132, 10x150) mm |
|||||
101-9459-003 |
Insulating butyl tape PSUL |
|||||
Vapor barrier tape |
||||||
101-9459-005 |
Diffusion waterproof tape |
|||||
101-1921-001 |
Polyurethane foam sealant (mounting foam) type Makroflekx, Soudal in cylinders of 750 ml |
balloon |
||||
Wooden wedges (including turnover) |
5. DOORS, GATES
Scope of work:
For norms 5-6: 04. Preparing the balcony door block for pre-installation in the opening (removing the leaves; from the outside, removing the protective film). 05. Installing the balcony door frame on technological wedges in the opening and setting it in a horizontal plane. 06. Device on the box of marks for drilling holes for dowels in places of embedded wooden plugs. 07. Removing the balcony door frame from the opening. 08. Drilling holes for dowels (from outside to inside the box). 09. Installation of the balcony door frame in the opening with leveling in the horizontal and vertical planes and fixing in the opening with wedges. 10. Drilling the wall for dowels using the existing holes in the balcony door frame. 11. Installation of dowels (when tightening, use screwdrivers with calibrated torque). 12. Connection of balcony door and window frames with self-tapping screws. 13. Filling the gap between the door frame and the wall with mounting foam. 14. Installation of self-expanding insulating, vapor barrier and water barrier tapes. 15. Hinge of shutters.
Gauge: 100 m openings
Resource ID |
Cost element name |
Unit meas. |
10-01-041-5 |
10-01-041-6 |
Labor costs of construction workers |
||||
Average work grade |
||||
Machinist labor costs |
||||
MACHINES AND MECHANISMS |
||||
Cars onboard with a carrying capacity of up to 5 tons |
||||
Truck-mounted cranes when working on other types of construction 6.3 t |
||||
Construction mast hoists 0.5 t |
||||
Electric perforators |
||||
Construction and installation screwdrivers |
||||
MATERIALS |
||||
|
||||
101-1921-001 |
Polyurethane foam sealant (mounting foam) type Makroflekx, Soudal in cylinders of 750 ml |
balloon |
||
101-9459-003 |
Insulating butyl tape PSUL |
|||
Vapor barrier tape |
||||
Diffusion waterproof tape |
||||
screws with countersunk head |
||||
Wooden wedges (including turnover) |
4. WINDOWS
NN |
Unit |
Direct costs, rub. |
Including, rub. |
|
|||||||||||
(Codes of unaccounted materials) |
|
wages of construction workers |
machine operation |
materials |
|||||||||||
including machine wages |
consumption of unaccounted materials |
||||||||||||||
Table 10-01-034 |
|||||||||||||||
Gauge: 100 m openings |
|||||||||||||||
Installation of PVC profile windows |
|||||||||||||||
10-01-034-1 |
deaf with opening area up to 2 m |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-2 |
deaf with an opening area of more than 2 m |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-3 |
rotary (folding, tilt-and-turn) with an opening area of up to 2 m single-leaf |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-4 |
rotary (folding, tilt-and-turn) with an opening area of more than 2 m single-leaf |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-5 |
rotary (folding, tilt-and-turn) with an opening area of up to 2 m double-leaf |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-6 |
rotary (folding, tilt-and-turn) with an opening area of more than 2 m double-leaf |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-7 |
pivoting (folding, tilt-and-turn) with an opening area of up to 2 m three-leaf, including in the presence of blind glazing |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
10-01-034-8 |
pivoting (tilting, tilt-and-turn) with an opening area of more than 2 m |
||||||||||||||
Polyvinylchloride window blocks (PVC) |
|||||||||||||||
5. DOORS, GATES |
|||||||||||||||
Table 10-01-041 |
Filling balcony openings in the stone walls of residential and public buildings door blocks wooden and PVC profiles |
||||||||||||||
Gauge: 100 m openings |
|||||||||||||||
Filling balcony openings in the stone walls of residential and public buildings with PVC door blocks: |
|||||||||||||||
10-01-041-5 |
opening area up to 3 m |
||||||||||||||
PVC balcony door blocks |
|||||||||||||||
10-01-041-6 |
opening area more than 3 m |
||||||||||||||
PVC balcony door blocks |
ESTIMATED PRICES FOR THE OPERATION OF CONSTRUCTION
MACHINERY AND ESTIMATE PRICES FOR MATERIALS, PRODUCTS AND STRUCTURES
IN BASIC PRICES AS OF 01/01/2000
OPERATION OF CONSTRUCTION MACHINES
Name |
Unit rev. |
Price without VAT, rub. |
||
estimated cost per machine-hour |
including driver wages |
|||
Truck-mounted cranes when working on other types of construction (except main pipelines) 6.3 t |
||||
Construction mast hoists 0.5 t |
||||
Construction and installation screwdrivers |
||||
Electric perforators |
||||
Cars onboard with a carrying capacity of up to 5 tons |
ESTIMATED PRICES FOR MATERIAL RESOURCES
Name |
Unit rev. |
Price without VAT, rub. |
|
Mounting foam for sealing joints in a 0.75 l can |
|||
101-9101-003 |
Mounting dowels 10x130 (10x132, 10x150) mm |
||
101-9228-008 |
Countersunk screws 6x55 mm |
||
101-9459-003 |
Insulating butyl pre-compressed sealing tape (PSUL) |
||
101-9459-004 |
Vapor barrier tape |
||
101-9459-005 |
Diffusion waterproofing tape |
||
Wooden wedges |
Collection TER 2001-10 St. Petersburg "Wooden structures"
NN |
Name and characteristics of construction works and structures (equipment) |
Unit |
Direct costs, rub. |
Including, rub. |
Labor costs of construction workers man-hour |
|||||||||||
(Codes of unaccounted materials) |
Name and characteristics of materials unaccounted for by prices |
wages of construction workers |
machine operation |
materials |
||||||||||||
including machine wages |
consumption of unaccounted materials |
|||||||||||||||
Table 10-01-034 |
Installation of window blocks made of PVC profiles in the stone walls of residential and public buildings |
|||||||||||||||
Gauge: 100 m openings |
||||||||||||||||
Installation of PVC profile windows |
||||||||||||||||
10-01-034-1 |
deaf with opening area up to 2 m |
|||||||||||||||
Polyvinylchloride window blocks (PVC) |
||||||||||||||||
10-01-034-2 |
deaf with an opening area of more than 2 m |
|||||||||||||||
Polyvinylchloride window blocks (PVC) |
Table GESN 10-01-039 Installation of blocks
Scope of work:
01. Retarding and upholstery of boxes with roofing paper (standards 1, 2, 5). 02. Installation of blocks. 03. Installation of platbands (standards 3, 4). 04. Installation of devices.
Meter: 100 m 2 openings
Installation of blocks in external and internal doorways:
Resource ID |
Unit meas. | ||||||
Average work grade | |||||||
Machinist labor costs | |||||||
MACHINES AND MECHANISMS | |||||||
MATERIALS | |||||||
Door blocks | |||||||
Manholes and hatches | |||||||
Hardware |
set | ||||||
lumber conifers. Edged boards 4-6.5 m long, 75-150 mm wide, 25 mm thick, grade III | |||||||
Ready-made finishing mortar, heavy, calcareous 1:2.0 | |||||||
Building nails | |||||||
Metal ruffs | |||||||
Gypsum binders G-3 | |||||||
Tow impregnated | |||||||
platbands | |||||||
Construction screws |
Table GESN 10-01-040 Filling of external and internal doorways separate elements in wooden chopped walls
Scope of work:
01. Installation of boxes with nailing of vertical bars to form a ridge, sampling a groove in the ends of the bars (logs). 02. Fitting and hanging door panels with the installation of appliances. 03. Installation of platbands.
Meter: 100 m 2 openings
Filling of external and internal doorways with separate elements in wooden chopped walls with an opening area:
Resource ID |
Name of cost elements |
Unit meas. | ||
Labor costs of construction workers | ||||
Average work grade | ||||
Machinist labor costs | ||||
MACHINES AND MECHANISMS | ||||
Cars onboard with a carrying capacity of up to 5 tons | ||||
MATERIALS | ||||
Door frames | ||||
Cloths for door blocks | ||||
Hardware |
set | |||
Softwood lumber. Edged boards 4-6.5 m long, 75‑150 mm wide, 25 mm thick, grade III | ||||
platbands | ||||
Building nails | ||||
Metal ruffs | ||||
Flashing 34×13 mm |
Table GESN 10-01-041 Filling balcony openings in the stone walls of residential and public buildings with blocks
Scope of work:
01. Installation of blocks with resin and roofing upholstery. 02. Caulking of boxes with tow, coating with a solution. 03. Installation of overhead devices.
Meter: 100 m 2 openings
Filling balcony openings in the stone walls of residential and public buildings with door blocks with leafs:
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Tower cranes when working on other types of construction (except for installation technological equipment) 8 t | ||||||
Mobile bitumen boilers 400 l | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t | ||||||
Construction and installation screwdrivers | ||||||
MATERIALS | ||||||
Balcony door blocks | ||||||
Hardware |
set | |||||
Tow impregnated | ||||||
Roofing with coarse-grained dressing waterproofing brand TG-350 | ||||||
Coal tar for road construction | ||||||
Building nails | ||||||
Construction screws | ||||||
Gypsum binders G-3 | ||||||
Roofing felt nails round 3.0×40 mm |
Table GESN 10-01-042 Filling balcony openings in wooden chopped walls with blocks
Scope of work:
01. Installing blocks with nailing vertical bars to boxes to form a ridge, cutting a groove in the ends of the bars (logs). 02. Caulking boxes. 03. Installation of platbands. 04. Installation of overhead devices.
Meter: 100 m 2 openings
Filling balcony openings in wooden chopped walls with door blocks with leafs:
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
Construction and installation screwdrivers | ||||||
MATERIALS | ||||||
Balcony door blocks | ||||||
Hardware |
set | |||||
Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III | ||||||
platbands | ||||||
Tow impregnated | ||||||
Building nails | ||||||
Construction screws | ||||||
Table GESN 10-01-043 Installation of boxes in wooden walls
Scope of work:
01. Installation of boxes (standards 1-8). 02. Nailing vertical bars to the boxes to form a ridge, making a groove in the ends of the bars (logs) (standards 1-4). 03. Installation of spacer boards in door frames (standards 3, 4, 7, 8). 04. Installation of platbands.
Meter: 100 m 2 openings
Installing boxes in wooden walls:
chopped in window openings up to 2 m 2 |
|
chopped in window openings with an area of more than 2 m 2 |
|
chopped in doorways up to 3 m 2 |
|
chopped in doorways with an area of more than 3 m 2 |
|
uncut in window openings up to 2 m 2 |
|
uncut in window openings with an area of more than 2 m 2 |
|
not chopped in doorways up to 3 m 2 |
|
not chopped in doorways with an area of more than 3 m 2 |
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
MATERIALS | ||||||
Door frames | ||||||
Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm wide, 40-75 mm thick, grade III | ||||||
platbands | ||||||
Building nails | ||||||
Sodium fluoride technical, brand A, grade I | ||||||
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
MATERIALS | ||||||
Door frames | ||||||
platbands | ||||||
Building nails | ||||||
Metal ruffs | ||||||
Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm wide, 32-40 mm thick, grade III | ||||||
Sodium fluoride technical, brand A, grade I | ||||||
Table GESN 10-01-044 Door upholstery
Scope of work:
01. Upholstery of door panels and frames roofing steel on wood (standards 5, 6, 11, 12) with lining of felt impregnated with clay mortar (standards 1, 2, 7, 8), asbestos cardboard (standards 3, 4, 9, 10). 02. Drying of roofing steel (standards 1-6).
Meter: 100 m 2 openings
Upholstery of doors with non-galvanized roofing steel:
on felt on both sides |
|
on felt on one side |
|
on asbestos from both sides |
|
on asbestos on one side |
|
wood on both sides |
|
wood on one side |
Upholstery of doors with galvanized roofing steel:
on felt on both sides |
|
on felt on one side |
|
on asbestos from both sides |
|
on asbestos on one side |
|
wood on both sides |
|
wood on one side |
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t | ||||||
MATERIALS | ||||||
Construction felt | ||||||
Roofing felt nails round 3.0×40 mm | ||||||
Drying oil natural | ||||||
Pigment grated | ||||||
Resource ID |
Name of cost elements |
Unit meas. | ||
Labor costs of construction workers | ||||
Average work grade | ||||
Machinist labor costs | ||||
MACHINES AND MECHANISMS | ||||
Cars onboard with a carrying capacity of up to 5 tons | ||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t | ||||
MATERIALS | ||||
Roofing steel STK-1 sheet thickness 0.50 mm | ||||
Roofing felt nails round 3.0×40 mm | ||||
Drying oil natural | ||||
Pigment grated | ||||
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t | ||||||
MATERIALS | ||||||
Construction felt | ||||||
Roofing felt nails round 3.0×40 mm | ||||||
Asbestos cardboard general purpose(KAON-1) 4 and 6 mm thick |
Resource ID |
Name of cost elements |
Unit meas. | ||
Labor costs of construction workers | ||||
Average work grade | ||||
Machinist labor costs | ||||
MACHINES AND MECHANISMS | ||||
Cars onboard with a carrying capacity of up to 5 tons | ||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t | ||||
MATERIALS | ||||
Steel galvanized sheet thickness sheet 0.50 mm | ||||
Roofing felt nails round 3.0×40 mm |
Table GESN 10-01-045 Additional caulk door frames tow in the outer walls
Scope of work:
01. Preparation of gypsum mortar by wetting tow (standards 1-2). 02. Caulking boxes.
Meter: 100 m 2 openings
Caulk of door frames with tow in the outer walls:
Resource ID |
Name of cost elements |
Unit meas. | ||||
Labor costs of construction workers | ||||||
Average work grade | ||||||
Machinist labor costs | ||||||
MACHINES AND MECHANISMS | ||||||
Cars onboard with a carrying capacity of up to 5 tons | ||||||
MATERIALS | ||||||
Gypsum binders G-3 | ||||||
Tow impregnated |
Table GESN 10-01-046 Gate installation
Scope of work:
01. Framing of openings with steel parts (standard 1). 02. Installation wooden boxes(norm 2). 03. Installation of canvases. 04. Installation of forgings and devices.
Meter: 100 m 2 canvases and openings
Resource ID |
Name of cost elements |
Unit meas. | ||
Labor costs of construction workers | ||||
Average work grade | ||||
Machinist labor costs | ||||
MACHINES AND MECHANISMS | ||||
Crawler cranes when working on other types of construction (except for main pipelines) up to 16 tons | ||||
Manual Arc Welding Machines (DC) | ||||
Cars onboard with a carrying capacity of up to 5 tons | ||||
Truck-mounted cranes when working on other types of construction (except for main pipelines) 10 t | ||||
Construction and installation screwdrivers | ||||
Mobile bitumen boilers 400 l | ||||
MATERIALS | ||||
Swing gates | ||||
Hardware |
set | |||
Hot-rolled thin sheets in sheets with cut edges with a width of more than 1200 to 1300 mm, a thickness of 3.2-3.9 mm, steel grade C235 | ||||
Sliding gate frames, swing lifting gates, up-and-over | ||||
Steel strip calm grade St3sp, 50-200 mm wide, 4-5 mm thick | ||||
Building nails | ||||
Drying oil natural | ||||
Earthen oil paints MA-0115: mummy, iron minium | ||||
Pressed rubber | ||||
Construction screws | ||||
Construction bolts with nuts and washers | ||||
Electrodes with a diameter of 6 mm E42 | ||||
Window boxes | ||||
Roofing with coarse-grained dressing waterproofing brand TG-350 | ||||
Sheet glass up to 1.0 m2, 1 group, 2 mm thick, grade M1 | ||||
Metal ruffs | ||||
Coal tar for road construction |