How to assemble a shower cabin 312. Assembling a shower cabin with your own hands: an independent step-by-step assembly of shower cabins. Installing a shower enclosure without a tray

The popularity of shower cabins is growing every day. It is connected not only with attractive appearance, functionality and compactness of this equipment, but also with the ability to significantly reduce water consumption and save time on hygiene procedures.

In addition, in the shower cabin, which has the function of hydromassage, steam bath, light, sound, aromatherapy, you can get a pleasant relaxation and recharge with vigor and positive. Along with the growing demand for this equipment, the need for competent installation is also growing. Recently, more and more often, the owners of shower cabins prefer to install the shower cabin with their own hands, guided by the instructions and the assembly diagram.

Types of shower cabins

Before proceeding with the installation of equipment, it is necessary to determine its types and basic concepts. There are showers and cabins. Both types of equipment can be adjacent to 1-3 sides of the room. But only the cabin can be placed in the center of the bathroom, without contacting with other enclosing structures. The main difference between a nook and a booth is that the nook uses the walls as its panels, while the booth has its own. In addition, it has a roof, while corners in some cases are delivered without roofs.

The assembly and installation of a shower cabin is advisable in rooms with low waterproofing, or in the case when it is planned to install a complex hydromassage system. But the corner is best to choose for small bathrooms, with a limited budget.

In order for the booth to serve you for a long time and without problems, the following points must be taken into account when installing it:

  • the connection of the water supply and electricity sewerage must be carried out in accordance with the installation instructions for the shower cabin;
  • the distance from the floor to the sewer pipe should be no more than 70 mm, otherwise the pallet is placed on the podium;
  • joints are treated with sealant.

Detailed instructions for assembling a shower cabin

First, try to assemble the structure "dry" (without the use of sealant) in order to assess how the parts fit together. At the same time, use the installation instructions and the scheme for assembling and installing the shower cabin.

Connecting to the sewer and assembling the pallet:

  • to sewer drain connect drain hose cabins;
  • we process the joints with a sealant;
  • put in the drain hole sealing gasket and apply silicone sealant to its surface. After the gasket has been installed under the pallet, we fix the drain assembly with screws.
  • brackets are attached to the wall to the height of the pallet panel. The height is determined by the possibility of connecting sewers;
  • we process the junction of the sewer pipe and the pallet with a sealant. How tight the connection can be checked by putting water into the pan.
  • align the pallet horizontally. For these purposes, you need a building level.

After the pallet is exposed, we fix the legs. The advantage of installing shower enclosures with a tray compared to installing shower enclosures with sloping floors is that there is no need for sanitary and hygienic measures during assembly. If there are no legs at the pallet, it is recommended to additionally strengthen the bottom of the structure with a concrete pad. In this case, the bottom will not sag under load.

Installation of enclosing elements

  • side panel mounting begins with the installation of guides on the pallet, on which the doors will be placed in the future. The elements are connected to each other using standard fasteners and silicone sealant. Make sure that the sealant does not get into the holes designed to improve the drainage. Based on the diagram, assemble the side walls of the shower cabin relative to each other. Make sure that the panels are strictly vertical. The maximum deviation from the vertical must not exceed 5 mm.

  • door installation produced in loops. If the design does not provide for the presence of loops, we act as follows: we turn the adjustable rollers up and pull the lower pressure rollers. We put silicone seals on the door and install it in place. By adjusting the upper rollers, we provide the door with an optimal position. Make sure the doors close tightly.

Cabin roof installation

The top of the booth is placed in special holes, after which it is securely fixed with fasteners. If the hydrobox has the function of a bath or sauna, we install a ventilation system. As a rule, this is a small fan, with the help of which steam will be removed from the hydrobox.

Shower water connection

Water connection is made only after the sealant has completely dried. Install Ball Valves, with which it will be possible to open / shut off the water supply to the cabin. You should also install a filter. This measure will significantly extend the life of the devices.

We connect to the water supply system as follows: we take flexible hoses of a certain length and connect them. If the shower cabin has a hydromassage function, you should pay attention to parameters such as pressure and water pressure (at least 2-3 atm).

Electrical connection

The installation diagram of a shower cabin, as a rule, contains detailed instructions connection to the mains. At the same time, there are rules that should be observed regardless of the hydrobox model: from the switchboard it is necessary to lay separate cable, provide automatic safety shutdown and install a moisture-proof three-pole socket. Before you go for an electrical cable, you should know its cross section. Power information can be found in the technical data sheet.

The shower cubicle must be grounded. To ensure protection against electric shock, set the device protective shutdown and circuit breaker(differentiated automaton).

The socket is placed behind the booth at a height of 220-230 mm from the floor. In this case, the socket must have reliable moisture and dust protection (index IP440). The current and voltage depend on the power of the hydrobox. As a rule, this is 250 W (voltage) and 16A (current). The socket can be installed in an open or hidden way.

After the assembly and connection of the shower cabin are completed, we check the tightening of the clamps on the hoses. This measure will prevent the hose from being torn off during operation. You should also use a wrench to check all the nuts.

Commissioning works

We check the drainage and tightness of the equipment. We make adjustments to the system data. If the pressure in the system does not meet the required parameters, you will have to additionally install a pump with a hydraulic tank with a volume of at least 200 liters.

If the pallet crackles under your feet, you need to remove the tap and adjust the legs. To give the structure stability, the legs can be put on a sealant or screwed with self-tapping screws. If the door movement is not smooth enough, loosen the adjusting screws a little.
Using the instructions, you can install the shower cabin yourself within 5-6 hours.

The shower cabin is increasingly replacing the usual bath in modern apartments and houses. This attribute can significantly increase usable area rooms, which is especially important for small bathrooms. Installation of the structure is not particularly difficult for a skilled owner and can be carried out as well. Before starting work, it is necessary to study the theoretical part of the question - how to mount a shower cabin, and then proceed to practice.

Before you assemble a shower cabin, you should. This approach will allow you to avoid a number of errors, as well as form an understanding of how to do it correctly.

If the installation of a cabin is planned instead of a bathtub and will use the same engineering structures, then such work does not require special approvals from the BTI.

In the case when there is an intention to keep the existing bath and put a cabin near it, care should be taken to enter the relevant redevelopment data into the BTI plan. This design involves the creation of an additional water intake point, and this already needs to be coordinated with the local water utility.

Self-assembly of the shower cabin

In most cases, showers are used corner design. The installation of such systems occurs according to a certain scheme.

Shower cabins consist of the following elements:

  • pallet;
  • back panel;
  • side walls;
  • roof;
  • doors;
  • vertical jays;
  • protective apron and skirt.

Cabin Mounting Tools

  • wrench;
  • screwdrivers;
  • level;
  • construction pistol;
  • silicone sealant;
  • electric drill;
  • flexible hoses;
  • FUM tape.

It is also better to purchase related components, the help of which may be needed in the process:

  • nuts, self-tapping screws, work gloves, scissors and so on.
  • Step 1: choose a place to install the structure and assemble the cabin without applying sealant.
  • Step 2: Direct installation of the cabin on the selected area of ​​the room.

This approach will make it possible to understand how to properly assemble a shower cabin before its major installation. It will be possible to verify that all necessary parts are present, check for holes and, if necessary, replace damaged or defective parts.

The preparatory stage before installing the pallet is the formation of a drain (branch) waste water. The best option the location of the outlet to the sewer system - directly under drain hole cabins. A drain is formed using flexible hoses.


Pallet installation steps:

  1. Put the tray on the legs.
  2. Using the adjusting screws, align the pallet in height and horizon, tightening the screws to the desired level.
  3. If the design of the shower cabin does not involve legs for the pallet, then you should first level the floor in the room with a cement screed.
  4. Make ceramic tiles.

The pallet of a number of shower cabins is made of acryle. Such material provides additional reinforcement of the frame. Elements of this type require support rails and an additional reference point in the center of the system.

In the absence of such a frame, the reliability of fixing the shower cabin must be provided with a special concrete cushion.

Before you start installing the shower cabin yourself, you need to make sure that the joints are tight at the junction of the pallet with the drain device.

This can be done in this way:

Clog the drain hose, and then pour water into the pan. Then make sure that the drain hose reaches sewer system and that the necessary slope is observed (150 - 200 mm per 1 meter).

Installation of the walls of the shower box

  • The next stage of installation is the installation of side panels and fencing.
  • First you need to make sure that the glass is intact and that there are no defects on it.
  • Next, determine the lower and upper part construction (there are fewer mounting holes in the lower part).
  • Then you need to define the top and bottom guides.

After that, start work:

  • lubricate the joints of the guides with sealant;
  • insert glass into the grooves;
  • tighten the screws located on the presser foot;
  • connect the rails to the rack using self-tapping screws (top and bottom);
  • put a seal on the glass;
  • applying sealant to the pallet under the lower guide;
  • glass installation.

Installing a shower cabin yourself, you can save a lot family budget. At the same time, this kind of work should be carried out with great responsibility and attention to detail.

Shower cabin assembly video

For example, it is important to ensure that the sealant does not get into the recesses in the pan. They are specifically designed to drain water.

The side panels of the shower cabin are attached to the tray with washers and self-tapping screws. For fixing in the pallet there is required holes, which must first be treated with silicone at the joints. The rear panel of the shower cabin is mounted in the same way.

However, quite often when installing a shower enclosure, some holes do not match. To avoid problems, when installing self-tapping screws, you should leave small gaps for the possibility of subsequent adjustment. Also, when clamping self-tapping screws, one should take into account the relative fragility of the material and not overdo it.

Upon completion of installation, it is necessary to check the operation of electrical appliances, if any are present in this cabin. Then leave the shower structure until the final hardening of the sealant.

Some shower cabins are equipped with electrical appliances:

Ventilation, radio, lighting.

These devices require a power source in the room. It should be noted that the bathroom, from the point of view of electrical safety, is a dangerous room. In such rooms, the presence of switchboards, chokes and other electrical equipment is strictly prohibited.

When installing a socket in the bathroom, it is better to place it with reverse side shower cabin. The socket must be closed type with index IP44. Such designs are protected from moisture and dust.

AT without fail grounding should be taken care of. As a grounding conductor, as a rule, it turns out metal pan designs.

In order to protect electrical appliances from surges and surges in the network, you can install a circuit breaker with the function emergency shutdown power or differential machine.

Nowadays, a shower cabin is not only an element of the bathroom, but also a functional and necessary thing. Assembling it with your own hands is not so difficult and will take only a few hours.

In contact with

Classmates

Basic equipment of a hydrobox (shower cabin)

Note that a variety of structural elements are offered for different shower cabins. Below is a complete set of a shower of an average price category. That is, in cheaper cabins some elements will be missing, in expensive cabins, respectively, there will be large quantity parts and functions. But in principle, the assembly scheme of all models is relatively similar. Therefore, we proceed to familiarize ourselves with the basic parts of the corner hydrobox:
- Shower tray

- Top panel (ceiling)

Sliding doors(or one door)

- L-shaped rear panel (in cheap models, this role is played by the walls of the room)

- Guides for doors

Vertical racks

- Apron or pallet skirt.

What is needed for installation?

From the tools, stock up on a level (at least 50 cm), adjustable and wrenches, drill and drills of small diameters, screwdrivers.

The kit includes the necessary fasteners and accessories.

List of materials to be purchased:
Antibacterial silicone along with gun (buy clear base).
Tow or fumka (materials for plumbing units)
Adapter for sewer pipe(preferably from flexible material).
You may need several.

Step 1. Checking the model for integrity

Before the main stages of cabin assembly, be sure to lay out all the elements of the shower and check for quantitative matches in the instructions (should always be!). Carefully inspect all panels, doors for scratches or cracks. If you find any defects, shortcomings - return the goods to the store. You are entitled to it.
There are many examples of such a procedure. For example, one man bought a toilet, installed it according to the instructions, and only after a few days of use did a leak appear in the ceramic itself. Turned out to be a factory defect. Plumbing was changed in a construction hypermarket immediately to a similar one, and they checked it there. Therefore, do not be afraid to return to the store if there is a good reason for this.

Pallet assembly

Step 2. Assembling the pallet

Take out the pallet, frame, apron and other small components. Remove the film and place the pallet on a cardboard sheet to avoid damage to the product. Now you need to assemble the frame according to the principle of the designer. If the frame is assembled, we attach it to the base of the booth.
Take the legs (10 - 12 mm) and screw the nuts with washers onto them. Next, we string the frame onto the pallet, securely tighten the nuts on top. The quality of the work done is checked by the absence of a gap between the frame and the cabin base.
Tighten the nuts with a wrench or adjustable wrench. Start with the top nuts, pressing the structure against the pallet, and then the bottom ones. Be careful when tightening the nuts, as the frame is not thick and can flex, causing the cab to become unstable.
Next, from all the fragments, select the hardware (), which are suitable for the final fixation of the frame to the pallet. They are determined by the number of holes and length. (Length = frame profile height + 5 mm). With these screws we fix the frame on the mounting points.
Take out the cabin apron and brackets for fastening to the top of the cabin base, remove the film. The necessary brackets (they are similar in shape to a question mark) are screwed onto the mortgages with 2 screws.
Next, we screw the nuts and put the washers on the legs, which are installed on the front of the pallet. From above we pass the black holders in the form of “G”, again we fix it with washers and nuts. Now adjust the fit of the apron to the holders. Mount the siphon to the base of the shower cabin.

Frame assembly process

Step 3. Assembly of the top panel (ceiling)

At this stage, difficulties should not arise. We print the top panel, then remove the protective film. Install necessary details on the "roof": lamp, speaker, radio, rain shower, cooler and decorative covers (sets of these elements may be different, or not at all).

Step 4. Assembly of the frame and panels

To assemble the frame of the shower cabin, we need 2 semicircular profiles and 2 vertical, 8 screws. Having found all the details, we assemble the door frame.
Be careful! To correctly assemble the door frame, it is necessary to determine the top and bottom on the profiles. On semicircular structures there should be inscriptions "UP" - top, "Down" - bottom. On straight profiles, there is a rectangular cutout at the bottom.
Also, don't forget to insert rubber stops on the semi-circular panels where the door wheels drive.

Step 5. Installing all panels on the pallet

Assemble and install the disassembled shower back panels necessary elements.
Now we move on to installing all the panels on the pallet. Install all panels one by one (there can be from 2 to 5 depending on the booth model) on the pallet without screwing. Inspect the borders and horizontal joints for cracks and irregularities.
All elements must clearly and tightly fit one to one, otherwise the shower will be leaky and lose its attractiveness. After connecting all the panels and fixing them confidently, screw them to the profile frame of the shower.
After installing the walls of the shower, carefully place the "roof" up. Screw the ceiling with 4 screws. The procedure for assembling the shower cabin does not provide for additional fastening of the ceiling on a semicircular profile. Often this is necessary, as the roof will hang out. If the cabin frame is tight enough, make a couple of small holes and screw the ceiling with self-tapping screws.
We're heading to the finish line. We place the upper structure of the hydrobox on the pallet, carefully moving it over the surface. Fix the cabin in the desired position with self-tapping screws.
Now go over the seams and gaps with silicone glue, which can serve as water flow.

Installed shower cabin

Step 6. Mounting the doors

First, install the front glass panels (if any) with cilia. Put the seals on the glass in advance and move the glass to the pass on the shower frame.
Before installing the doors, screw the roller mechanism to them. Insert the doors into the cabin frame and adjust them by performing various manipulations (close and open). Having defined correct position doors in space, tighten the screws on the rollers with inside cabins at closed doors.

Step 7. Connecting the hydrobox

The final stage of our work will be the connection of the shower cabin to communications. Connect the hot and cold water to the booth, connect the siphon to the sewer. Carry out several tests by pouring several buckets of water. If there is no leak anywhere, the shower is ready for use. Here, screw the apron of the pallet and move the hydrobox into place.

Assembling a shower cabin with your own hands - the pros and cons

Without using the services of plumbing installation specialists, you save a significant amount in your budget on shower installation. Self-installation and the instructions below guarantee that work with the shower will be done efficiently and reliably. Another plus will be the acquired knowledge and skills that will be 100% useful in the future.
The obvious disadvantage for some will be the time spent. Assembling a shower stall for the first time takes about 1 day. You will also need a certain number of tools, and in their absence, the installation process is difficult.

Video instruction:

In contact with

See inaccuracies, incomplete or incorrect information? Do you know how to make an article better?

Would you like to suggest photos for publication on a topic?

Please help us make the site better! Leave a message and your contacts in the comments - we will contact you and together we will make the publication better!

A shower is a device whose appearance can be attributed to the time when people only learned how to supply water through pipes. Shower cabins are a logical development of this device. Even in the Soviet Union, they were actively used where there were restrictions on the size of bathrooms, although they gained the greatest popularity in the West. At the present time, the shower cabin is in stable demand in the domestic market, which leads to a variety of prices for them. As a consequence of this popularity, the installation price is increased, which is why it becomes popular to assemble a shower cabin with your own hands.

On the market, shower cabins are presented both by Chinese models, which are in demand due to their average quality and low price, and more durable ones made in Germany, Italy, Russia and other countries. It is this variety of goods that makes the choice available.

preliminary stage

Cabin assembly begins with checking all components. It is necessary to fully check the integrity of all elements, especially glasses. They are manufactured according to special technology, are shockproof and hardened, so when damaged they break into many elements without sharp edges. It is enough just to shake the package to determine the integrity of the glass by sound. On the remaining parts of the shower stall, defects, geometric errors, or damage are unacceptable.

Cabin items include:

  • pallet (has various forms, most often comes with a reinforced frame);
  • doors (most often they have rollers for moving and fastening elements);
  • glass for doors (usually transparent, rarely frosted);
  • wall, side panels(water supply and other functions are carried out);
  • the roof of the shower stall (depending on the manufacturer and type, may be missing);
  • factory fasteners and elements for installation.

The assembly of a Chinese shower cabin, like any other, begins only after a thorough check and creation of a workplace. If the dimensions of the bathroom are not large enough, it is better to assemble in another place in several stages, transferring the finished parts.

For quality installation you must have at hand the tools and additional materials from the list below.

Required tools:

  • adjustable wrench (or gas);
  • flat and Phillips screwdriver;
  • drills for metal of small diameter (3-6 mm);
  • level (for aligning the installed parts);
  • screwdriver, or as a replacement for a drill;
  • silicone squeezing gun;
  • sharp knife.

Additional materials you may need:

  • sealant (silicone) transparent, antibacterial;
  • tape for waterproofing;
  • hoses for supplying hot and cold water;
  • transition to sewerage 32/50;
  • paint, gloves, brush for correcting defects.

It is necessary to check the place under the installed shower stall. It must be level, have waterproofing, it is also desirable to have ventilation to remove steam if the cabin does not have a roof.

Pallet assembly

This is the most important stage, which determines how strong the booth will stand, as well as how well it will work. Almost all pallets are equipped with legs on which it will stand, and the main thing is to align them correctly (use a level) and secure them (nuts and fasteners). Items related to pallet assembly:

  • apron;
  • bracket;
  • hairpins;
  • frame;
  • nuts;
  • screws;
  • siphon;
  • pallet itself.

Advice. Before starting work, it is worth removing the apron from the pallet - it will be needed only at the end of the assembly.

The installation instructions for the pallet are very simple.


Panel installation

First, you need to once again inspect the glass panels and determine their orientation. Usually, the top of the glass has more holes than bottom. To determine the guides, you need to look at the dimensions - the top one will be larger and wider, and in the bottom guide you can see a small curly cutout. The assembly of the corner shower stall differs only in the number of side panels, there are fewer of them, only 2.

Installation must begin with the installation of glass in the appropriate places in the guides. It is advisable to lubricate all joints with sealant. The rails must be connected to the rack with self-tapping screws that come with the kit. In this case, it is necessary to put a seal on the glass. Silicone sealant must be greased with the entire lower guide, which will be connected to the pallet. After installing the glass.

Advice. when applying the sealant, it is necessary to leave the places for the drainage of water not filled, it is advisable to clean them from foreign material.

You need to install the side panels on the pallet, checking the positions on the special attachment points where the screws will have to be inserted to fasten one to the other. After tightening the screws, it is necessary to treat all joints with sealant, and then install and secure the back panel.

Tip: do not tighten the screws all the way, keeping a small gap, which may be needed for adjustment in the future.

The installation of the pallet assembled with panels must be done carefully, carefully measuring the level and gaps. Try to avoid strong impacts, the metal can bend.

After installation, it is worth checking the operation of electricity by connecting a radio, a backlight or a fan. If no problems arise, you can leave the shower stall for a while to harden the bonding sealant.

Installation of glass shutters

Before installing the wings on the doors, it is necessary to attach the rollers and seals in the places that are marked for fastening. Having carefully fixed and smeared with sealant, it is necessary to install the sashes. You can adjust the gap between the doors using the upper rollers, achieving a full fit of one door to the other in order to avoid water leaks during the use of the shower. On some models, the rollers have screws where you can install plugs that protect them from moisture.

Final stage

Your corner shower assembly is coming to an end. All that is left is to fix the shower head in the cabin, with a hose; backlight, fan and speaker. All elements along the edges must be smeared with sealant, and also used with a factory protective layer that protects against moisture.

After installation, you need to check the cabin pan for cracking, leaking or other defects. If you hear a crackling sound, or if you feel a change in the position of the pallet, you need to adjust the height of the legs.

Advice. fill the pan with water and wait a few hours, you can see all the leaks.

If everything is in order, then you should finally connect the necessary communications: water, electricity and sewerage, as well as attach the missing fittings - handles, mirrors and shelves.

Features of assemblies of some models

The assembly of the Serena shower cabin is different from the general assembly made in China

The first stage - the installation of the Serena cabin tray is no different from the standard one, but then there are differences in the installation of the side parts of the shower cabin and doors. They are mounted on special factory racks, which must first be fixed to the floor. With the help of factory fasteners, the side parts of the booth will be attached to these racks. In this case, the observance of the angles between the pallet and the screen plays an important role. In the process of fixing, it is necessary to carefully lubricate the holes with a sealant.

Doors are installed last, have the original sliding system, special hinges for fastening, with the help of which they are opened and closed.

Roof installation is very simple. It is fastened with bolts in the provided attachment points and does not cause difficulties.

The assembly of the Niagara shower enclosure also has several differences in the installation and installation of the side parts and doors.

The side parts of the niagara cabin must be assembled according to the following instructions:

  1. the base (main part) is closely attached to the wall;
  2. to it, through specially provided holes, the side ones are threaded. In this case, the entire connection is strengthened with a sealant;
  3. after the connector has hardened, the doors are installed on the factory hinges, which are located on one of the side parts;
  4. roof installation and additional equipment goes to the last step.

Everything today more people moving from bulky and impractical bathtubs to lightweight and compact shower enclosures that replace and even outperform old-fashioned bathtubs in many ways, and also save space in small bathrooms. If you also experienced the advantages and benefits of such a bathing facility as a shower cabin, then this article will tell you how to quickly and correctly assemble and connect this modern unit to all communications on your own. So, let's figure it out.

Tools and materials

As soon as you have chosen and purchased a new thing for your bathroom, and the delivery service has brought the components into the apartment, you should carefully inspect all the details for mechanical damage. Glass surfaces require special attention.

If you did not find such damage, then you can safely sign the delivery certificate, pay for the purchase and begin the installation process.

To start assembly operations You need to take inventory of your tools. Make sure everything you need is close at hand. Required fixtures include:

  • adjustable wrench (Swedish);
  • a screwdriver with a Phillips bit or a similar screwdriver;
  • drill of small diameter;
  • silicone squeezing gun;
  • a small flat screwdriver (it is needed when tightening the small bolts in the faucet levers).

In addition to tools, you should also prepare some auxiliary materials necessary for the quality performance of the task. So, you need to prepare:

  • silicone antibacterial transparent;
  • two hoses of 1.5 meters;
  • transition to sewerage with a diameter of 32/50;

When all the necessary tools and auxiliary materials have been prepared, and the tested and purchased components of the bathing unit are ready for assembly, the installation process can begin.

The assembly of the shower cabin begins with a pallet.

Find among a large number boxes with signatures pasted on them packed shower tray. Unpack the cardboard container and inspect its contents. In addition to the presence of the pallet itself, a number of other structural elements should be inside it:

  • pallet apron;
  • metal frame from a profile for a pallet;
  • studs, on the basis of which the legs will be attached;
  • brackets for fitting an apron;
  • many nuts and washers;
  • screws and siphon.

In the event that you could not find all these elements in a container with a pallet, it means that the manufacturers packed them in a separate box. The next step is to deploy and remove the protective film coating from the pallet.
The frame, on which, in fact, the entire shower cabin will stand, may be ready-made, assembled, and may be in disparate parts. If your equipment has not yet been mounted, then you should twist the support manually.

To do this, find the frame itself and lay it on top of the pallet, combining the attachment points.

Important!In order to avoid mechanical damage on the pallet, which is now left without a protective film layer, a piece of cardboard should be placed under it (you can use the bottom of the package itself, previously separated from the walls for convenience).

After screwing two nuts on each stud, use them to connect the supports to the frame and the pallet itself.

Put the frame on the exposed studs and fix it with nuts on both sides (one has already been screwed on by you in advance, screw the second on top of the frame). tighten nuts metal frame so that its surface touches the bottom of the pallet.
Starting to assemble the shower tray Don't overtighten the nuts as the base frame is quite thin and you could bend it and break it. overall sustainability and structural integrity. Now select the screws of the appropriate size (profile height plus another 5 mm) with which to attach metal frame to the pallet.

At the bottom of the pallet there are already ready-made bulges with which you need to dock the frame. After docking, boldly tighten the screws.

Video: how to assemble a shower tray

At the very beginning of this stage, remove the protective film from the screen. Now be very careful and careful not to accidentally scratch the apron, because this is the face of your cabin.

Attach the apron to the previously assembled structure and find its correct position. Now find the screws that are the right length, and start the screwing process by attaching the brackets to the mortgages.
Now a similar operation must be repeated with the brackets on the pallet itself. Brackets in the kit are plastic white or black, as well as metal. If with the first special difficulties does not arise, then you will have to tinker with the metal ones in order to correctly fit it to the pallet.

Important!At this stage, it is important to make the final adjustment of the fit of the bottom of the apron to the brackets, because it will be very problematic for you to do this further. The main thing you need to pay special attention to is the perpendicularity and proper curvature of your screen. If the lines appear clear and smooth, then everything is done correctly. If obvious curvatures are noticeable, then everything must be set before continuing with the subsequent assembly.

The next moment you need to put on each of the three or four (depending on your model) studs a nut and a washer. String black brackets on top of them, shaped like the Russian letter "G".

One of the sides of such a bracket, short and perforated, should look towards the apron. Now put another washer and nut on each stud and fix the brackets.

Assembly technology

When the lower part of the future bathing unit is assembled, you can rise from the floor to your feet and continue assembling the system. The next phases of installation will be the ceiling, frames from the cabin doors, walls, central panel and hydromassage. So, let's figure it out.

Immediately after the pallet, we recommend doing the ceiling. And first of all, find among your many boxes with accessories the one that contains the lid itself, a light bulb, a rain shower, speakers, a cooler and many other small details, the number and set of which depends on your shower cabin model.

When you find the right cardboard container, print it out and remove the protective film from all parts to make it easier for yourself to further assembly and not be distracted.
From now on, try to act as carefully as possible and without sudden movements in order to keep all new surfaces in a presentable form and not cause mechanical scratches or damage during the installation process.

Now we insert the wire and the lamp itself into a hole suitable for it. Using metal spacers, secure it firmly to the ceiling, after which be sure to check your work.
Shower cabin lamp The speaker (or speakers) will fall into place next.

Did you know?In order to ensure complete noise and vibration isolation of the speaker, a small layer of sealant should be applied along the contour of the device. Then he will not rattle and make extraneous sounds, and therefore, will not interfere with enjoying a tropical shower to divinely beautiful music.

The speakers are closed with special protective grilles, which will protect them from water ingress and from mechanical damage. These chrome parts are attached with screws that you can identify by number and length.

Here it is better to work manually, since any oversight - and the screwdriver will quickly scratch mirror surface chrome grille.
Mounting the speaker on the ceiling of the shower The next step in the installation of the roof will be the installation of a cooler (fan). Everything is quite simple here: four screws are threaded into four holes, and in a few minutes your fan will fall into place.

Next, move on to the rain shower, which is also located on the ceiling. We put the corresponding parts in place and fix them. In the center we fix with a nut, which will hold the shower. If you couldn't achieve symmetry the first time, it doesn't matter. Unscrew the nut a little and, having set the correct position, tighten it again.
Installation of a rain shower on the ceiling of the shower cabin That's all. The roof of your shower enclosure is assembled.

After successfully assembling the pallet and roof, it's time for the door frame and walls.

To mount the frame from the cabin doors, you need to find four parts: 2 straight and 2 semicircular, as well as 8 screws from of stainless steel, which will connect the structure.
To correctly position the parts, you should carefully consider the stickers on them, where the upper and lower frames will be indicated. You should also inspect the entire structure and determine the convex grooves for future glass. All slots must face the same direction.

When you deal with correct location details, proceed to twisting the elements together. Here it is also better to work with a manual screwdriver so as not to cause any damage.

Did you know? The oldest bath known to mankind is almost 5 thousand years old. It was found during the excavations of the palace of Knossos on the island of Crete.

This operation can be carried out using the functions of a screwdriver. To do this, the tool is set to the "troika" mode, and then slowly to low revs screw is inserted after the screw.

There may be some difficulties caused by the need to get the mounted screws on the bit into the corresponding hole in the frame (the screw has a tendency to constantly slip and fall).

In this case, you need to use silicone, having processed all the heads of the screws with it. This technique will help to put the slots of the screws on the bit of the screwdriver more firmly and quickly cope with the work.

You may be a little embarrassed by a certain shakiness and fragility of the resulting structure, but you should not overtighten the screws, let alone insert more. When all door parts, including glass, are in place, the frame will acquire the necessary stability and strength.
Now place the stops (small transparent cylinders). With notches, such limiters should look towards the door. These elements not only limit the movement of the door so that it does not crash into the body and is not damaged, but also contribute to its smooth movement.
Rubber stops Pass thin and short screws into the stops and fix them in the appropriate places.

Important!Find the screws for the stoppers you need. They should be visible no more than 3 mm when inserted into the transparent cylinder. If the screws are longer, then you can cause irreparable damage not only to the limiters themselves, but also break the door frame, and this cannot be fixed without replacing parts and, accordingly, additional costs.

Last important point the hinges will be lubricated with grease. All luxury cabins are lubricated on the hinges to ensure maximum sliding and smooth movement of the door.

When assembling the walls, the basic rule also applies when you first need to set and measure everything, and only then screw it on, but do not tighten it with force.

Also, during the assembly of the walls, special seals or sealant should be used to avoid further leaks. If the central panel is disassembled, then we start the assembly from it.
Shower wall assembly

Properly position the decorative chrome metal cover. The pictures in the instructions will help you with this. Next, place the mixer levers in their place. Now we turn to the assembly of the hydromassage.

To assemble the hydromassage, find a nozzle with an outlet. This will be the final element of the chain, which is installed first in the corresponding hole with a nut.
Do not forget to put a washer under the nut so that the structure does not loosen during operation.

Important!Don't overstock the hose around bends and bends as there may not be enough hose for all the elements!

Further, in accordance with the instructions and its image, insert the nozzle after the nozzle, collecting general scheme of six elements. It is not necessary to overtighten the nuts so as not to damage the parts.

Now it's time to connect the hoses to connect the circuit together.

First, connect all the hydromassage nozzles together. Then stretch the hose to a regular watering can, and at the end connect the rain shower system to the water supply.

Put the hose on the desired fitting, and connect the other end to the fitting of the initial nozzle. Then carry out all the connecting work in accordance with your instructions. Using the supplied clamps, fix the hose along its entire length so that it does not dangle or sag.

After removing the protective film from the shower guide block, try it on the appropriate place in the structure to make sure it fits. Such a delivery set includes special clamping brackets, with which you need to fix the control unit on the wall of the shower cabin.
Control block
Effortlessly tighten the brackets with screws and process the seams with silicone. Thanks to this action, you will set the panel with the necessary stability and tightness to the wall surface.
Sometimes the hole for the control box is too big and it can stand up a bit crooked. In this case, slightly loosen the brackets and, after adjusting, tighten again.

At this point, the process of assembling and mounting the control box of your new shower enclosure is complete.

To engage in the installation of the walls of the bathing apparatus is separate from the pallet, so that all parts fit snugly together. Fasten the side elements of the box in turn to the central wall, joining them vertically.

Important!Do not hurry. Check that the panels are properly aligned. They should fit perfectly with each other. Otherwise, you will have gaps and leaks.

Before you cover this structure with a roof, you must install the door frame in its place, which you also prepared in advance. In eight places, the frame is fixed with screws and a screwdriver.

Correctly adjust the parts so that the grooves for the screws match, otherwise unwanted gaps will form through which water will subsequently flow out.

After finishing fitting and assembling the wall panels and door frame, cover the structure in advance assembled roof. It is easier to do this before the entire box has been placed on the pallet.

The roof must be fixed with four screws to the walls: two in the central wall and one on the side. If you want to completely strengthen your structure, then you can fix the roof to the door frame, so that the latter does not sag or dangle.
For this, manufacturers do not provide fasteners, and therefore you will have to work with a thin (2 mm) drill, and then screw in thin screws. Be careful not to damage the hollow profile of the door frame and ruin the whole job.

When both sides fit perfectly to the main center panel and the roof has found its place, transfer the assembled structure to the inverted working position pallet and fasten it along the joint line.

Check the resulting design for gaps. If any were found, try to align the walls and remove the gap manually. If this does not help (in Chinese models, the pallet is often curved), use silicone and go around all the seams between the walls and the pallet.
Having reached the symmetry of the roof, walls and pallet, you can proceed to one of milestones high-quality installation of a new shower cabin with your own hands - sealing the seams.

Gently and carefully go through all the joints that up to this point have remained without silicone sealant. Feel free to smear the silicone with your fingers to improve its adherence to surfaces and improve sealing effectiveness.

To improve the effectiveness of sealing, wipe the seams lubricated with silicone with a cloth previously moistened with a degreaser.

Did you know?The largest bath in the world is located in the Babolovsky Palace of Tsarskoye Selo. It is hollowed out of granite, and its dimensions are 1.96 m in height and 5.33 m in diameter. The wall thickness is 45 cm. This structure weighs 48 tons.

Skip the roof and door frames for now, here you still need to complete the package and go through the stage of assembling and installing doors, to which you are moving on.

While the silicone dries, attention should be paid to assembling and installing the door panels.

After unpacking and removing protective film position them from the door panels as they will be installed in the shower cabin, so as not to confuse the screwing side of the rollers and cilia. The rollers are installed only on the top of the door, if this rule is neglected, then you will not be able to install the door in its place.
So, the first step in assembling the doors will be the installation of the side windows in the corresponding guides of the vertical profiles.

in advance on glass surface planted plastic seals, which also need to be well lubricated with silicone, and even better oiled in order to improve the sliding of doors during installation and further during operation. The grooves on the profiles are also recommended to be smeared with an oily composition.
Having completed the previous stage, we fix the door leaf on the profile, after which we put on the bottom row of rollers.

Having inserted the door leafs into place in the corresponding grooves for the rollers, you need to adjust the position of the eccentrics, which are located in the rollers themselves. This can be done by turning the eccentrics with the narrow part up, thereby making the interval between the rollers as remote as possible.

Important! In addition, the tightening of the nut fasteners on the rollers deserves special attention. You can't drag them, because tempered glass easily exposed to mechanical damage and burst so quickly that you do not have time to come to your senses and understand what happened. Under the order, such glass is made within a month.

Once the front glass panels have been properly installed, the doors can be installed.

An important point is the final fit, straightening and inspection of the correct closure and the action of the magnetic inserts that regulate the closure and snug fit. door panels to each other. If these magnets do not work well, then they must be adjusted by turning the eccentrics on the single-roller door holders or by screwing in the screw in the two-roller holders.
Obliquely drilled holes can be the culprit that the doors will not reach the end. In this case, you need to unscrew the limiters, and then set the correct position from the inside.

Next, armed with a drill and a thin (about 3 mm) drill, correct the manufacturer's mistake and insert the stops in the desired position. Now the problem of door panels flying out of the guide profiles and their loose fit will be solved.

hydrotesting

Before you install electrical equipment and thereby complete the installation of the shower cabin, you need to check the unit for leaks so that nothing leaks anywhere and does not spoil your work and your mood.

Having finished connecting the water communications, arm yourself with a shower head and turn on the water. Gradually bypass the water pressure on all surfaces that can get water during bathing (you can not touch the ceiling).

Alternately close the cabin doors and check the tightness glass partitions. Pay special attention to the junction of the walls and the pallet, as this is the most dangerous place where leaks are most commonly found.

If you find that water is leaking somewhere, dry the surface with a rag and hair dryer, then seal the gap with silicone. Wait until it hardens and repeat hydrotesting.

If there is no leak, then you are entering the finish line, namely, the installation of electrical equipment.

When connecting the speakers, fan and lamp to the mains, follow the labels and inscriptions on the outgoing and incoming cords. That way you never make a mistake. All you need to do is to plug the desired cord into the appropriate socket one by one.
The power supply is best placed on the cab ceiling to minimize the chance of water getting on the electrical wiring.

Now that everything is assembled, do a final test by turning on all the functions of your shower enclosure in turn. Turn on the water, start the rain shower, experience the whirlpool, turn on the music and turn on the fan.

If everything works, then you have succeeded, and you have mastered the task of assembling and installing a shower cabin at home, on which we congratulate you!

The process of assembling a shower cabin cannot be called simple and fast, but thanks to step by step instructions it is quite possible to do it yourself. In addition, by performing this procedure yourself, you will learn all the nuances and possible places of breakdowns and will be able to repair and replace components yourself if necessary.

The best videos on installing shower cabins with your own hands

Video: how to independently assemble and install a shower cabin

Video: installation of a shower cabin

Video: how to assemble a shower cabin using the example of Erlit 4510TP C4