Assembly installation of a shower cabin. Assembling a shower cabin: video tutorials on proper installation. Connection Requirements

Shower cabin assembly necessary work for the device of optimal and practical solution for the bathroom.

The shower cabin is convenient for its compact size.

Often such equipment is installed in large bathrooms as additional equipment.

Assemble shower stall on your own It won't be difficult, just follow the instructions strictly.

Acquisition is a hot topic today, as in the conditions small bathrooms standard apartments, this solution allows you to optimize and save space.

This article presents a shower cabin assembly diagram, as well as video instructions and various options placement and design.

In most cases, shower cubicles in the form of a corner are used in the installation.

Such systems are similar to each other and include:

  • roof;
  • pallet;
  • side and back panels;
  • doors and factory racks;
  • apron and "skirt" of the pallet.

Preparatory stage

The procedure for installing a shower stall involves a combination of various activities that require certain knowledge and patience.

For a smooth installation of the equipment, it is necessary to treat the surface and isolate all plumbing communications.

For assembly work, you must purchase the necessary tools and materials:

  • wrench;
  • screwdrivers;
  • electric drill;
  • washers, bolts;
  • silicone sealant;
  • fittings, pipes, hoses and siphon;
  • knives;
  • paint and brushes;
  • building level, tape measure, marker and more.

When choosing the booth model itself, you need to find out all the important details from the seller: assembly features, operating pressure indicator, whether there are requirements for electrical wiring, water supply system, etc.

Before starting work, you should make sure that the siphon reaches sewer drain and how well it is made.

The wires should be free to reach a waterproof outlet, without being stretched.

Pallet installation

Assembling a shower cabin with your own hands begins with the installation of a pallet, which is an acrylic container with a metal cross bolted to it.

Usually all pallets have special legs that must be set with a level and strengthened with nuts.

The installation instructions regulate the installation of the shower legs strictly in one plane in order to prevent the tray from swaying or sagging of one of the legs.

In advance, you should install a tee for several outlets, with which you can connect a bath, washbasin and washing machine.

If in the bathroom, in addition to the shower, it is also supposed to use a bath, then this must be agreed with the specialized authorities and changes should be made to the BTI plan in order to be able to arrange an additional water point.

In addition, it is necessary to check the strength of the connecting gasket: if it is in doubt, then a moisture-resistant sealant will be required.

The pallet is installed in a corner so that it fits snugly against the walls, eliminating the formation of gaps. The section contains detailed video instruction for pallet assembly.

Frame and walls

The cabin frame is assembled from uprights and two arcs that provide movement of the cabin doors. Two vertical guides are screwed to the outer edges.

They are attached using the screws and dowels that come with the kit.

Holes in the wall intended for the installation of guides must be sealed with silicone along the contour of its installation.

Inserting glass is not difficult, as they have a special edge.

The further scheme provides for the following activities:

  • with self-tapping screws, the stand is connected to the arch;
  • the pallet is connected to the panels;
  • silicone lubricates the joints between the booth and the rear walls.

Installation of the roof and cabin doors

Attention should be paid to the established minimum gap between the roof and ceiling. Such a distance, equal to 25-30 cm, will be needed for installation and further provision of the cabin.

Installation of watering cans, lighting and speakers is carried out before fixing the roof. The joints between the attachment of equipment and the roof should also be treated with a sealant.

The roof is attached with self-tapping screws in the places that the scheme provides, for this it is necessary to make additional holes in the roof, in addition to those that already exist.

Cabin doors are mounted after the pallet, frame and roof are installed. Before installing the doors, it is necessary to fix the rollers on them and put on the seals.

After that, the rollers must be adjusted so that the doors are perfectly connected to each other, eliminating the possibility of moisture passing through.

Plumbing and power supply device

Before installing the siphon, you should make sure that it is of good quality.

Most often, manufacturers are trying to save money on the siphon, so, for sure, you will have to purchase a new, higher-quality item.

After one end drain hose fixed to the pan, and the second to the drain hole, it is necessary to drain the water and check for leaks.

When supplying water, remember that operating pressure booth is in the range from 1.5 to 4 bar, which must correspond to the pressure in the water pipe.

As a rule, existing modern market models of shower cabins have a variety of options that require electrical supply.

The video below shows instructions that show how to install a shower cabin.

For the shower, you will need a special outlet, adapted specifically for rooms with high humidity.

The procedure for assembling the shower stall ends with the installation of the so-called "skirt" on the pallet.

Before you start operating the shower stall, you need to make sure that the joints are sealed and there are no leaks anywhere.

Even if the cabin is completely sealed, the bathroom must have a ventilation system.

Shower cabins of the brands Serena and Niagara, installation features

Shower cabins of the Serena and Niagara brands belong to the middle price segment and offer various acrylic, polymer or glass models of larger and smaller sizes, which mainly have a deep tray.

Such cabins, which are full-fledged small-sized shower rooms, include:

  • walls and ceiling;
  • rain shower and a stand for the main watering can;
  • hydromassage;
  • shelves;
  • convenient drain blocker.

Serena shower cabins have rightfully won recognition from consumers due to their high functionality and ergonomics.

The scheme provides for the assembly of the cabin as part of the panel, wall, roof and main elements.

After attaching all components, check additional functions such as radio, backlight, ventilation system etc.

Mounting areas made with regular self-tapping screws are treated with silicone sealant.

Assembling a shower cabin with your own hands ends with the launch and verification of the entire system.

When buying such a cabin, you should purchase additional set mounts.

Differences between mounting the Serena booth from standard options begin at the stage of assembling the side walls and doors, which are installed on factory racks fixed to the floor.

It is important to observe the angles between the pallet and the walls.

Doors that are mounted on final stage, have a unique sliding system, special hinges that provide opening and closing.

shower cabin - great alternative bathroom, especially if you have to equip a small bathroom. However, the owners of spacious bathrooms are increasingly choosing comfortable and multifunctional shower cabins.

Choice optimal model, competent installation and careful operation is the key to long, comfortable and uninterrupted use of the shower cabin.

Benefits of using a shower

A shower cabin is a specially equipped, enclosed place for taking a shower. Today, the possibilities of using showers have increased, various additional functions have appeared: hydromassage, steam generator, stereo system and others.

Many consumers note a number of advantages of a shower over a bath:


Shower cabins: reviews

In order for all the advantages of a shower cabin to be fully realized, it is necessary to choose the right model and correctly install it.

Types of shower cabins: design and installation features

All shower cabins can be divided into two main groups:

  1. Shower corners - cabins of open type.
  2. Shower boxes - cabins closed type.

shower enclosures

corner shower cabin- one of the most popular models. The cabin design does not have rear walls and a roof. The space around the shower cabin is limited on one or both sides by the walls of the cabin, and on the other - by the walls of the bathroom.

Open showers can have a shower tray or be installed directly on the bath floor.

For installation shower enclosure you can purchase a ready-made cabin kit (walls, doors and tray) or pick up the elements separately

Depending on the depth of the pallet open cabins can be divided into several types:

Low pallets do not have the possibility of reinstallation, as they are permanently mounted. Installation deep pallets on the metal frame allows you to maintain hidden communications, and if necessary, move the shower cabin to another place

Shower cabins: photo

Features of the design and installation of open showers:

shower enclosures from clear glass visually expand the space, giving elegance and lightness to the design of the bathroom

shower boxes

Shower box - complete closed space with entrance doors. The closed cabin has a roof and walls on all sides.

This box is more convenient to use and easier to install. However, the cost for closed models is higher than for open showers (buy an ordinary box without special functions possible at a price of 30,000 rubles, and a shower corner - from 7,000 rubles).

The price of closed-type shower cabins directly depends on the number of built-in functions, the size of the box and the material of manufacture.

Shower boxes can have the following functions:

Even the most primitive models of closed cabins have a radio, top and side lighting, a seat, shelves, a dispenser for detergents and a mirror.

Criteria for choosing a quality shower cabin

It is necessary to choose a shower stall based on the needs of the family and the parameters of the bathroom.

Before buying a shower cabin, you need to test it: check the strength of the pallet (walk along the bottom of the cabin), look at the fastening of the frame with the pallet, try to swing the elements of the box (cabin High Quality shouldn't wobble)

Self-installation of a closed-type shower cabin

The shower installation scheme directly depends on the complexity of the design, and the assembly sequence for most models is the same.

Preparatory work

In order to have an idea of ​​how to assemble a shower cabin, you need to read the instructions that come with the kit.

Before starting installation, you need to prepare the following tools and materials:

  • building level;
  • silicone sealant;
  • spanners;
  • sharp knife;
  • crosshead screwdriver;
  • dye;
  • tassel;
  • gloves;
  • siphon for draining;
  • flexible hoses;
  • fum tape or tow;
  • chisel;
  • a hammer;
  • perforator;
  • simple pencil;
  • shower instructions.

The preparatory stage involves the implementation of a number of activities:

Pallet installation

The assembly of the shower cabin should begin with the installation of the pallet:


Fixing panels and railings

Before you start installing the panels, you need to decide on the location of the glasses. If there are no marks on the railings indicating the top and bottom of the part, then you can focus on the number of mounting holes - usually there are more of them on top.

How to install panels and railings:


At this stage, you need to check the work electrical devices(lighting, ventilation).

Roof and door installation

Before fixing the roof, it is necessary to install a backlight, a watering can and speakers on it.

The distance between the ceiling and the roof of the cabin must be at least 25-30 cm

For mounting the roof, you can use the existing holes, and, if necessary, make new ones. The roof is fixed with bolts and screws.

Shower doors are installed after mounting the side, rear walls and roof

Door installation sequence:


Now you can screw on accessories (shelves, mirror, dispenser) and fittings (handles, handrail).

Cabin connection to communications

Cold and hot water must be supplied to the cabin. It is desirable that the operating pressure of the booth (1.5-4 bar) coincides with the pressure of the water main.

To connect the shower cabin to the mains, you must install a separate waterproof socket. The socket must be positioned so that there is no tension on the wire (optimally - on the side or behind the cab).

For a socket in the bathroom, it is advisable to install an RCD and allocate a separate electrical wiring line.

Assembling shower cabins (instruction): video

Installing a shower enclosure without a tray

Installation of a shower enclosure with a tray is practically no different from installation shower box. Differences arise if the shower cabin is mounted without a pallet - on the bathroom floor.

Before installing the cabin, prepare the base as follows:

  1. Decide on the size of the corner and choose a place for it.
  2. Perform waterproofing of the floor and adjacent walls.
  3. Install a drain ladder on the floor - a grate through which water drains into sewer system.
  4. The tiles on the floor of the shower enclosure must have a very low degree of slip.

For high-quality water drainage, the floor slope in the area of ​​the drain must be at least 3 °

Prevention of malfunctions and repair of a shower cabin

It is important to keep the shower cabin clean and control the operation of all its elements.

In order to prevent breakage, important details(mixer, nozzles, steam generator) you should take care of the quality of the water and install filters for mechanical water purification. Such measures will significantly reduce the risk of calcium formations on the working elements.

Once every three months, cartridges or cartridges in filters must be changed

Over time, the shower stall may start to leak. The main cause of the malfunction is poor grouting or damage silicone sealant.

In this case, the cabin in the places of leaks must be disassembled, the parts must be cleaned of contamination and residues of the old layer of sealant. After that, apply a new layer of silicone sealant, assemble the cabin and rub the seams well.

Assembling a multifunctional cabin complex design it is better to entrust it to a professional, and you can install a simple box or corner yourself, the main thing is not to rush and follow the instructions clearly.

Everything today more people moving from bulky and impractical bathtubs to lightweight and compact shower enclosures that replace and even outperform old-fashioned bathtubs in many ways, and also save space in small bathrooms. If you also experienced the advantages and benefits of such a bathing facility as a shower cabin, then this article will tell you how to quickly and correctly assemble and connect this modern unit to all communications on your own. So, let's figure it out.

Tools and materials

As soon as you have chosen and purchased a new thing for your bathroom, and the delivery service has brought the components into the apartment, you should carefully inspect all the details for mechanical damage. Glass surfaces require special attention.

If you did not find such damage, then you can safely sign the delivery certificate, pay for the purchase and begin the installation process.

To start assembly operations You need to take inventory of your tools. Make sure everything you need is close at hand. Required fixtures include:

  • adjustable wrench (Swedish);
  • a screwdriver with a Phillips bit or a similar screwdriver;
  • drill of small diameter;
  • silicone squeezing gun;
  • a small flat screwdriver (it is needed when tightening the small bolts in the faucet levers).

In addition to tools, you should also prepare some auxiliary materials necessary for the quality performance of the task. So, you need to prepare:

  • silicone antibacterial transparent;
  • two hoses of 1.5 meters;
  • transition to sewerage with a diameter of 32/50;

When all the necessary tools and auxiliary materials have been prepared, and the tested and purchased components of the bathing unit are ready for assembly, the installation process can begin.

The assembly of the shower cabin begins with a pallet.

Find among a large number boxes with signatures pasted on them packed shower tray. Unpack the cardboard container and inspect its contents. In addition to the presence of the pallet itself, a number of other structural elements should be inside it:

  • pallet apron;
  • metal frame from a profile for a pallet;
  • studs, on the basis of which the legs will be attached;
  • brackets for fitting an apron;
  • many nuts and washers;
  • screws and siphon.

In the event that you could not find all these elements in a container with a pallet, it means that the manufacturers packed them in a separate box. The next step is to deploy and remove the protective film coating from the pallet.
The frame, on which, in fact, the entire shower cabin will stand, may be ready-made, assembled, and may be in disparate parts. If your equipment has not yet been mounted, then you should twist the support manually.

To do this, find the frame itself and lay it on top of the pallet, combining the attachment points.

Important!In order to avoid mechanical damage on the pallet, which is now left without a protective film layer, a piece of cardboard should be placed under it (you can use the bottom of the package itself, previously separated from the walls for convenience).

After screwing two nuts on each stud, use them to connect the supports to the frame and the pallet itself.

Put the frame on the exposed studs and fix it with nuts on both sides (one has already been screwed on by you in advance, screw the second on top of the frame). tighten nuts metal frame so that its surface touches the bottom of the pallet.
Starting to assemble the shower tray Don't overtighten the nuts as the base frame is quite thin and you could bend it and break it. overall sustainability and structural integrity. Now select the screws of the appropriate size (profile height plus another 5 mm) with which to attach metal frame to the pallet.

At the bottom of the pallet there are already ready-made bulges with which you need to dock the frame. After docking, boldly tighten the screws.

Video: how to assemble a shower tray

At the very beginning of this stage, remove the protective film from the screen. Now be very careful and careful not to accidentally scratch the apron, because this is the face of your cabin.

Attach the apron to the previously assembled structure and find its correct position. Now find the screws that are the right length, and start the screwing process by attaching the brackets to the mortgages.
Now a similar operation must be repeated with the brackets on the pallet itself. Brackets in the kit are plastic white or black, as well as metal. If with the first special difficulties does not arise, then you will have to tinker with the metal ones in order to correctly fit it to the pallet.

Important!At this stage, it is important to make the final adjustment of the fit of the bottom of the apron to the brackets, because it will be very problematic for you to do this further. The main thing you need to pay special attention to is the perpendicularity and proper curvature of your screen. If the lines appear clear and smooth, then everything is done correctly. If obvious curvatures are noticeable, then everything must be set before continuing with the subsequent assembly.

The next moment you need to put on each of the three or four (depending on your model) studs a nut and a washer. String black brackets on top of them, shaped like the Russian letter "G".

One of the sides of such a bracket, short and perforated, should look towards the apron. Now put another washer and nut on each stud and fix the brackets.

Assembly technology

When the lower part of the future bathing unit is assembled, you can rise from the floor to your feet and continue assembling the system. The next phases of installation will be the ceiling, frames from the cabin doors, walls, central panel and hydromassage. So, let's figure it out.

Immediately after the pallet, we recommend doing the ceiling. And first of all, find among your many boxes with accessories the one that contains the lid itself, a light bulb, a rain shower, speakers, a cooler and many other small details, the number and set of which depends on your shower cabin model.

When you find the right cardboard container, print it out and remove it. protective film from all the details to facilitate further assembly and not be distracted.
From now on, try to act as carefully as possible and without sudden movements in order to keep all new surfaces in a presentable form and not cause mechanical scratches or damage during the installation process.

Now we insert the wire and the lamp itself into a hole suitable for it. Using metal spacers, secure it firmly to the ceiling, after which be sure to check your work.
Shower cabin lamp The speaker (or speakers) will fall into place next.

Did you know?In order to ensure complete noise and vibration isolation of the speaker, a small layer of sealant should be applied along the contour of the device. Then he will not rattle and make extraneous sounds, and therefore, will not interfere with enjoying a tropical shower to divinely beautiful music.

The speakers are closed with special protective grilles that will protect them from water ingress and mechanical damage. These chrome parts are attached with screws that you can identify by number and length.

Here it is better to work manually, since any oversight - and the screwdriver will quickly scratch mirror surface chrome grille.
Mounting the speaker on the ceiling of the shower The next step in the installation of the roof will be the installation of a cooler (fan). Everything is quite simple here: four screws are threaded into four holes, and in a few minutes your fan will fall into place.

Next, move on to the rain shower, which is also located on the ceiling. We put the corresponding parts in place and fix them. In the center we fix with a nut, which will hold the shower. If you couldn't achieve symmetry the first time, it doesn't matter. Loosen the nut a little and correct position, tighten again.
Installation of a rain shower on the ceiling of the shower cabin That's all. The roof of your shower enclosure is assembled.

After successfully assembling the pallet and roof, it's time for the door frame and walls.

To mount the frame from the cabin doors, you need to find four parts: 2 straight and 2 semicircular, as well as 8 screws from of stainless steel, which will connect the structure.
To correctly position the parts, you should carefully consider the stickers on them, where the upper and lower frames will be indicated. You should also inspect the entire structure and determine the convex grooves for future glass. All slots must face the same direction.

When you deal with correct location details, proceed to twisting the elements together. Here it is also better to work with a manual screwdriver so as not to cause any damage.

Did you know? The oldest bath known to mankind is almost 5 thousand years old. It was found during the excavations of the palace of Knossos on the island of Crete.

This operation can be carried out using the functions of a screwdriver. To do this, the tool is set to the "troika" mode, and then slowly to low revs screw is inserted after the screw.

There may be some difficulties caused by the need to get the mounted screws on the bit into the corresponding hole in the frame (the screw has a tendency to constantly slip and fall).

In this case, you need to use silicone, having processed all the heads of the screws with it. This technique will help to put the slots of the screws on the bit of the screwdriver more firmly and quickly cope with the work.

You may be a little embarrassed by a certain shakiness and fragility of the resulting structure, but you should not overtighten the screws, let alone insert more. When all door parts, including glass, are in place, the frame will acquire the necessary stability and strength.
Now place the stops (small transparent cylinders). With notches, such limiters should look towards the door. These elements not only limit the movement of the door so that it does not crash into the body and is not damaged, but also contribute to its smooth movement.
Rubber stops Pass thin and short screws into the stops and fix them in the appropriate places.

Important!Find the screws for the stoppers you need. They should be visible no more than 3 mm when inserted into the transparent cylinder. If the screws are longer, then you can cause irreparable damage not only to the limiters themselves, but also break the door frame, and this cannot be fixed without replacing parts and, accordingly, additional costs.

Last important point the hinges will be lubricated with grease. All luxury cabins are lubricated on the hinges to ensure maximum sliding and smooth movement of the door.

When assembling the walls, the basic rule also applies when you first need to set and measure everything, and only then screw it on, but do not tighten it with force.

Also, during the assembly of the walls, special seals or sealant should be used to avoid further leaks. If the central panel is disassembled, then we start the assembly from it.
Shower wall assembly

Properly position the decorative chrome metal cover. The pictures in the instructions will help you with this. Next, place the mixer levers in their place. Now we turn to the assembly of the hydromassage.

To assemble the hydromassage, find a nozzle with an outlet. This will be the final element of the chain, which is installed first in the corresponding hole with a nut.
Do not forget to put a washer under the nut so that the structure does not loosen during operation.

Important!Don't overstock the hose around bends and bends as there may not be enough hose for all the elements!

Further, in accordance with the instructions and its image, insert the nozzle after the nozzle, collecting general scheme of six elements. It is not necessary to overtighten the nuts so as not to damage the parts.

Now it's time to connect the hoses to connect the circuit together.

First, connect all the hydromassage nozzles together. Then stretch the hose to a regular watering can, and at the end connect the rain shower system to the water supply.

Put the hose on the desired fitting, and connect the other end to the fitting of the initial nozzle. Then carry out all the connecting work in accordance with your instructions. Using the supplied clamps, fix the hose along its entire length so that it does not dangle or sag.

After removing the protective film from the shower guide block, try it on the appropriate place in the structure to make sure it fits. Such a delivery set includes special clamping brackets, with which you need to fix the control unit on the wall of the shower cabin.
Control block
Effortlessly tighten the brackets with screws and process the seams with silicone. Thanks to this action, you will set the panel with the necessary stability and tightness to the wall surface.
Sometimes the hole for the control box is too big and it can stand up a bit crooked. In this case, slightly loosen the brackets and, after adjusting, tighten again.

At this point, the process of assembling and mounting the control box of your new shower enclosure is complete.

To engage in the installation of the walls of the bathing apparatus is separate from the pallet, so that all parts fit snugly together. Fasten the side elements of the box in turn to the central wall, joining them vertically.

Important!Do not hurry. Check that the panels are properly aligned. They should fit perfectly with each other. Otherwise, you will have gaps and leaks.

Before you cover this structure with a roof, you must install the door frame in its place, which you also prepared in advance. In eight places, the frame is fixed with screws and a screwdriver.

Correctly adjust the parts so that the grooves for the screws match, otherwise unwanted gaps will form through which water will subsequently flow out.

After finishing fitting and assembling the wall panels and door frame, cover the structure in advance assembled roof. It is easier to do this before the entire box has been placed on the pallet.

The roof must be fixed with four screws to the walls: two in the central wall and one on the side. If you want to completely strengthen your structure, then you can fix the roof to the door frame, so that the latter does not sag or dangle.
For this, manufacturers do not provide fasteners, and therefore you will have to work with a thin (2 mm) drill, and then screw in thin screws. Be careful not to damage the hollow profile of the door frame and ruin the whole job.

When both sides fit perfectly to the main center panel and the roof has found its place, transfer the assembled structure to the inverted working position pallet and fasten it along the joint line.

Check the resulting design for gaps. If any were found, try to align the walls and remove the gap manually. If this does not help (in Chinese models, the pallet is often curved), use silicone and go around all the seams between the walls and the pallet.
Having reached the symmetry of the roof, walls and pallet, you can proceed to one of milestones quality installation a new do-it-yourself shower cabin - sealing the seams.

Gently and carefully go through all the joints that up to this point have remained without silicone sealant. Feel free to smear the silicone with your fingers to improve its adherence to surfaces and improve sealing effectiveness.

To improve the effectiveness of sealing, wipe the seams lubricated with silicone with a cloth previously moistened with a degreaser.

Did you know?The largest bath in the world is located in the Babolovsky Palace of Tsarskoye Selo. It is hollowed out of granite, and its dimensions are 1.96 m in height and 5.33 m in diameter. The wall thickness is 45 cm. This structure weighs 48 tons.

Skip the roof and door frames for now, here you still need to complete the package and go through the stage of assembling and installing doors, to which you are moving on.

While the silicone dries, attention should be paid to assembling and installing the door panels.

After unpacking and removing the protective film from the door panels, align them as they will be installed in the shower cabin so as not to confuse the screwing side of the rollers and cilia. Rollers are installed only on upper part doors, if this rule is neglected, then you will not be able to install the door in its place.
So, the first step in assembling the doors will be the installation of the side windows in the corresponding guides of the vertical profiles.

in advance on glass surface plastic seals are mounted, which also need to be well lubricated with silicone, and even better oiled in order to improve the sliding of the doors during installation and further during operation. The grooves on the profiles are also recommended to be smeared with an oily composition.
Having completed the previous stage, we fix the door leaf on the profile, after which we put on the bottom row of rollers.

Having inserted the door leafs into place in the corresponding grooves for the rollers, you need to adjust the position of the eccentrics, which are located in the rollers themselves. This can be done by turning the eccentrics with the narrow part up, thereby making the interval between the rollers as remote as possible.

Important! In addition, the tightening of the nut fasteners on the rollers deserves special attention. You can't drag them, because tempered glass easily exposed to mechanical damage and burst so quickly that you do not have time to come to your senses and understand what happened. Under the order, such glass is made within a month.

Once the front glass panels have been properly installed, the doors can be installed.

An important point is the final fit, straightening and inspection of the correct closure and the action of the magnetic inserts that regulate the closure and snug fit. door panels to each other. If these magnets do not work well, then they must be adjusted by turning the eccentrics on the single-roller door holders or by screwing in the screw in the two-roller holders.
Obliquely drilled holes can be the culprit that the doors will not reach the end. In this case, you need to unscrew the limiters, and then set the correct position from the inside.

Next, armed with a drill and a thin (about 3 mm) drill, correct the manufacturer's mistake and insert the stops in the desired position. Now the problem of door panels flying out of the guide profiles and their loose fit will be solved.

hydrotesting

Before you install electrical equipment and thereby complete the installation of the shower cabin, you need to check the unit for leaks so that nothing leaks anywhere and does not spoil your work and your mood.

Having finished connecting the water communications, arm yourself with a shower head and turn on the water. Gradually bypass the water pressure on all surfaces that can get water during bathing (you can not touch the ceiling).

Alternately close the cabin doors and check the tightness glass partitions. Pay special attention to the junction of the walls and the pallet, as this is the most dangerous place where leaks are most commonly found.

If you find that water is leaking somewhere, dry the surface with a rag and hair dryer, then seal the gap with silicone. Wait until it hardens and repeat hydrotesting.

If there is no leak, then you are entering the finish line, namely, the installation of electrical equipment.

When connecting the speakers, fan and lamp to the mains, follow the labels and inscriptions on the outgoing and incoming cords. That way you never make a mistake. All you need to do is to plug the desired cord into the appropriate socket one by one.
The power supply is best placed on the cab ceiling to minimize the chance of water getting on the electrical wiring.

Now that everything is assembled, do a final test by turning on all the functions of your shower enclosure in turn. Turn on the water, start the rain shower, experience the whirlpool, turn on the music and turn on the fan.

If everything works, then you have succeeded, and you have mastered the task of assembling and installing a shower cabin at home, on which we congratulate you!

The process of assembling a shower cabin cannot be called simple and fast, but thanks to step by step instructions it is quite possible to do it yourself. In addition, by performing this procedure yourself, you will learn all the nuances and possible places of breakdowns and will be able to repair and replace components yourself if necessary.

The best videos on installing shower cabins with your own hands

Video: how to independently assemble and install a shower cabin

Video: installation of a shower cabin

Video: how to assemble a shower cabin using the example of Erlit 4510TP C4

Let me guess, you bought a rectangular shower and here it is in the boxes in your bathroom, and no one knows what to do next. In order for the assembly of a rectangular shower cabin to be painless, a plan was drawn up especially for our readers, which you will find below. for the bathroom, we wrote in another article.

Let's face it, assembling a shower cabin with the hands of specialists costs from 2000 rubles, and this is not small amount, it is better to please the children or the wife with this money, so be patient and get down to business.

Cabin types

Rectangular shower cabins are classified according to two aspects - the manufacturer and the type of installation. There is a wide variety in the cabin market, ranging from cheap Chinese models to expensive European ones.

Install cheap Chinese cab it is not always easy, very often the equipment is not complete, some parts are missing, and some are clearly not made for this option or made exactly the opposite. European cabs are a pleasure to assemble.

By installation type:

  • With a pallet on the frame;
  • With a low pallet or without it at all.

Rectangular framed shower enclosures have the advantage of being easy to assemble. All that is required is to assemble according to the instructions and align with the studs installed on each leg.

Cabins with or without a low pallet imply preliminary work on leveling and waterproofing the floor.

What is the cabin made of?

The first thing you need to do is verify that all the structural elements of the shower cabin are in place.

The main elements of the shower cabin:

  • Roof;
  • Pallet;
  • Walls;
  • Vertical racks;
  • doors;
  • Screen;
  • Apron.

Before buying, it is necessary to check the quality of parts, the quality of the material from which they are made, of course, it is too late to do this at home, but still.

What is needed for assembly?

Before assembly, you should unpack all the elements and carefully arrange them in order, it is best if it is in another room, in practice it is checked that doors and walls break very easily.

To assemble the shower you will need:

  • Sealant with a construction gun;
  • Flexible hoses for water supply, the length must be measured in advance;
  • Screwdriver;
  • Level;
  • Adjustable wrench - small;
  • Slotted and Phillips screwdrivers;
  • Tow.

All fasteners, screws and gaskets are already included, but just in case, it's better to check.

Installation and assembly of the shower is best done on flat floors with waterproofing.

Assembly instructions

A rectangular cabin should be assembled in the middle of the room so that it is possible to go around it in a circle. Before proceeding, be sure to check all the holes, if they are not there, you need to drill them. Armed with the instructions, do not hope to solve all problems so easily, it is better to search the network in advance for a video instruction specifically for your model, it will be more reliable.

Make sure that there is a socket next to the installation site for connecting your shower. Extension cords that everyone loves to throw around are not the safest thing to do in the bathroom. And remember that the distance between the top of the shower room and the ceiling must be at least 30cm.

Pallet installation

Check the possibility of connecting the pallet to the sewer after assembly, if this is not possible, then you will have to assemble the cabin at the installation site. All parts have a protective layer of cellophane, before installation it must be removed. If your pallet does not have a frame and is placed on the floor, then you are less fortunate at this stage.

Thread the lock nuts onto the studs and screw them into the pan, the short stud is screwed into the center of the pan. After screwing in until it stops, fix with a nut. During twisting, do not tighten "for a fool", you need to feel the thread, otherwise it can be torn off.

Next, take the second lock nuts and screw them onto each of the studs, be sure to look at the notches, they should look up.

Turn the pan upside down with the studs and tighten on both sides with the nuts.

Attach to the front studs plastic mounts for decorative screen, the perforated part looks down.

It is time to screw the legs to the shower cabin and lock them, then it remains to adjust the height of the screen along the bottom edge. Be sure to level by twisting the legs.

The gap between the floor and the brackets should be 2 cm.

Sewer installation

In order to properly mount the drain and siphon, it was necessary to remove the film, if you have not already done so, do this step without proceeding to the next one.

The kit comes with a gasket for the top of the drain, you will replace it with a layer of sealant. Insert the semi-automatic lid into drainer and fasten the siphon from below, just in case, treat the thread of the siphon with sealant too.

Using an adapter, connect the siphon to the sewer, having previously lubricated it with sealant, but this step is best done at the end.

Installation of side and rear walls

Often during the assembly of the cabin, the question arises, where is the bottom, where is the top near the walls. The answer is simple, where more holes- this is the top. The walls are prefabricated or monolithic, for prefabricated walls, it is better to pre-fill the grooves with sealant, and then insert the glass.

Remove the protective film from the top of the tray, leaving it at the bottom.

Connect the holes on the pallet with the corner and simply screw on the screws.

Having drawn a line where the wall will pass, unscrew and apply a layer of sealant along the line.

We install the wall back and remove the excess sealant with a rag.

Now try on the back wall with the side wall and draw a line of contact. We apply sealant to the line, connect and twist together. We also attach the second wall.

Roof installation

AT different models shower cabins fastening of roofs is carried out differently. There are models where the roof is simply inserted into the grooves of the walls and this is quite enough. There are options when you have to fasten with screws, for this additional holes are drilled.

To mount the roof, remove the film from it, for this you need to unscrew the ventilation grill and dynamos, if any.

In order for the fan to suck air out of the cab, and not blow into it, mount it with the symbols outward.

Unscrew the watering can and coat the hole with sealant.

We put the roof in place and fasten it with 4 self-tapping screws.

You need to connect a water supply hose to the watering can, it is attached with a clamping clip.

For the fan to work, you need to supply power to it, the connections are made using wires that have a propeller pattern.

From the inside, coat the ceiling seams with sealant.

Door installation

There are grooves on the walls, holes for the limiters must already be made there, fix them with self-tapping screws.

Fasten the handles to the doors, otherwise, when they are in place, it will be more difficult to do this.

Now fasten the moldings to the doors from the side of the handles. Hang the doors on the upper rollers and press the buttons to slide the lower rollers into the grooves. Check door movement.

Finishing touches

Your cabin is almost assembled by your hands.It remains to hang the shelves, connect the power supply, and also insert the drain hose into the sewer hole. But before that, let's fix the decorative screen.

Lean the screen against the spacers and mark where the holes will need to be made.

After marking, drill holes and screw the screen to the brackets.

After the assembly of the rectangular shower cabin has passed, it remains only to put it in place and coat all the seams with sealant and let it dry.

Installation prices

If you are going to assemble the cabin for the first time, then be prepared to take a small risk, because there is no experience in this matter yet. If you are not afraid of difficulties and responsibility, then see how much you can save, and if you do not want to take risks, then it is better to contact a specialist.

Installation cost will depend on:

  • Design complexity (closed models are more expensive than open ones)
  • Be realistic, and the price of a hydrobox will affect the cost of installation (installers are also people, and they know the plumbing market better than you).
  • From quantity additional work(installation of filters, counters, etc.)

On average, the cost of assembling a simple shower cabin costs about 3,000 rubles.

Any manufacturer strives to create a unique model that will be fundamentally different from others. This can be seen in the design features and during the installation stages. All this uniqueness is created for monopolization. On the example of the most purchased hydroboxes, you will see this for yourself.

Serena

Serena will cost you around 28,000 rubles, but for such a lot of money, it can still make you nervous at the assembly stage. The manual that comes with the kit sometimes contradicts itself. Collecting this model please use common sense and standard assembly instructions.

note that back wall is assembled using special brackets that are mounted on a load-bearing wall. It is better not to use the self-tapping screws that come with the kit, replace them with better ones.

Niagara

Going to niagara standard instruction. For reliability, do not spare the sealant at the joints, rubber seals have a minus to pass moisture. By turning the faucet, water can not flow well into the shower, it's all about pressure. This type cabins loves good pressure, otherwise you will have to swim under a meager jet.

Ika

Highly moody look cabins. The entire line presented to these manufacturers does not tolerate the slightest distortion. This is reflected even at the installation stage, with the slightest deviation from the vertical and it will not be possible to fix the doors evenly.

Luxus 530

Connecting luxus to plumbing system Please pay close attention to the wiring diagram. The model has various modes work and only the correct installation of fittings will achieve perfect operation.

That's all, now you have an idea about all the steps professional installation cabins, and the saved 2500 can be safely left in family budget. You have probably made sure that each model has individual approach, 4 models is only a small part of the iceberg. Therefore, we strongly recommend that you look for instructions for assembling your particular hydrobox.

All information about fashionable in one article.

Chinese-made shower cabins are no different from their Italian counterparts, except for one thing - the presence of a normal, clear instructions in Russian. But in terms of price, Chinese products, as always, stand out favorably among Italian and Spanish-made shower cabins. So, for example, South Korean and Chinese corner cabins 90/90 cm will cost about 12,500 rubles, while for a shower Italian manufacturer GRUPPO TRESSE can lay out all 250,000 rubles. The difference is impressive! It remains to connect the ingenuity and assemble the shower cabin yourself.

Types of shower cabins

  1. closed shower, consisting of a tray, shower walls, a top cover and the shower itself, and if it is a multifunctional cabin, then additional nozzles are added to it.
  2. open shower, consisting of a pallet, a shower ruler and doors. The walls of the shower cabin are the tiled walls of the bathroom itself.

The pallet is needed to collect and remove water. The shape of the shower trays are angular and rectangular. According to the height of the pallets, they are flat (but they require a special drain of water) and bathtub pallets, in which you can even sit. The most popular pallet material is acrylic, but there are ceramic, cast iron pallets and even stone products.

Shower walls provide tightness and prevent water from entering the floor. Also on the wall are a mixer and hydromassage equipment. In open showers, 80% of the shower walls are made up of sliding doors.

Basically, such cabins are placed in the corner of the bathroom. It is necessary that the corner be tiled from floor to ceiling. On one of the walls there should be hot pipes and cold water. There must be a sewer outlet in the floor or under the wall.

Tools for installing a corner shower enclosure

  • level
  • gas key
  • screwdriver or drill
  • drills for metal 3 and 6 mm
  • bits RN-1
  • Phillips and slotted screwdrivers
  • hoses for water supply
  • waterproofing tape
  • 2-3 cans of mounting foam

Installation steps for a corner shower

After sealing again insert the clamp and hose into place. With reverse side we put a sealing rubber on the hose and also process it with silicone, because the diameter of the hose is 4 cm, and the sewer outlet is 5 cm. The hose, due to its length, is inserted into the sewer. After installing the siphon, you need to pour water into the pan and see if is there a leak. If all is well, then you can do a major mount. The pallet is placed in the place of final installation, rises 5 cm(here you will need the help of an assistant), and 2-3 cylinders of mounting foam are poured under the pallet.

The pallet is put into place and loaded from above with cargo. The cargo should be impressive, for example, bags of cement, boxes of tiles. It is best to put the load not on a pallet, but on a shield of a similar lift, so that the pallet does not warp under heavy weight. Next, you need to wait a day until the full drying foam.

We install the walls of the shower cabin.

  • First we put back where the control panel is located, where all the electrics are, cold and hot water is located on the inside. It is placed next to the side panel, connected to it with screws and fastened to the pallet with self-tapping screws. Bonding point treated with sealant.

ATTENTION! We do not fix all fasteners until they stop until the final installation. All cabin walls are assembled separately and only then installed in the cabin.

The rectangular shower cabin is surrounded by glass walls on three sides, and there is a door on the fourth side. This is far from economical option so it needs to be installed by a professional. But, if you are still confident in your abilities, there are some recommendations for installation.

Rectangular Cabin Mounting Tools

  • level
  • sewer metal pipes diameter 5 cm
  • hydraulic seal
  • drills for metal 3 and 6 mm
  • drain funnel
  • decorative grate drain
  • concrete mortar
  • waterproofing mastic
  • construction screed

Installation steps for a rectangular shower enclosure

In principle, the installation of a rectangular cabin is not much different from the installation of a corner cabin.

Estimated prices for accessories

  • Cezares MODENA glass shower door and walls, length 120 cm, width 90 cm, height 1950 cm, price 43,900 rubles
  • Lateral glass wall Timo SP-900, price 9,130 ​​rubles
  • Door glass "accordion" Timo BT-639−90, price 19 930 rubles
  • Side shower wall Ravak PIVOT PPS-100, price 13,166 rubles
  • Glass for a shower cabin, price 1,100−2,700 rubles / meter
  • Аcuzzi, Ego shower panel with thermostat, price 106,930 rubles
  • Shower panel AM. P. M. Bliss W53P-1−124M, price 19,242 rubles
  • Shower enclosures GROHE Euphoria 27296001, price 22 576 rubles
  • Shower railing Kaiser SXP-90-02 bronze, price 11,300 rubles

Shower cabin installation video