How to assemble a glass shower enclosure. How to assemble a shower cabin. Ceiling panel installation

shower cabin - great alternative bathroom, especially if you have to equip a small bathroom. However, the owners of spacious bathrooms are increasingly choosing comfortable and multifunctional shower cabins.

Choice optimal model, competent installation and careful operation is the key to long, comfortable and uninterrupted use of the shower cabin.

Benefits of using a shower

A shower cabin is a specially equipped, enclosed place for taking a shower. Today, the possibilities of using showers have increased, various additional functions: hydromassage, steam generator, stereo system and others.

Many consumers note a number of advantages of a shower over a bath:


Shower cabins: reviews

In order for all the advantages of a shower cabin to be fully realized, it is necessary to choose the right model and correctly install it.

Types of shower cabins: design and installation features

All shower cabins can be divided into two main groups:

  1. Shower corners - cabins of open type.
  2. Shower boxes - cabins closed type.

shower enclosures

The corner shower is one of the most popular models. The cabin design does not have back walls and roofs. The space around the shower cabin is limited on one or both sides by the walls of the cabin, and on the other - by the walls of the bathroom.

Open showers can have a shower tray or be installed directly on the bath floor.

For installation shower enclosure you can purchase a ready-made cabin kit (walls, doors and tray) or pick up the elements separately

Depending on the depth of the pallet, open cabins can be divided into several types:

Low pallets do not have the possibility of reinstallation, as they are permanently mounted. Installation deep pallets on a metal frame allows you to maintain hidden communications, and if necessary, move the shower cabin to another place

Shower cabins: photo

Features of the design and installation of open showers:

shower enclosures from clear glass visually expand the space, giving elegance and lightness to the design of the bathroom

shower boxes

Shower box - complete closed space with entrance doors. The closed cabin has a roof and walls on all sides.

This box is more convenient to use and easier to install. However, the cost for closed models is higher than for open showers (buy an ordinary box without special functions possible at a price of 30,000 rubles, and a shower corner - from 7,000 rubles).

The price of closed-type shower cabins directly depends on the number of built-in functions, the size of the box and the material of manufacture.

Shower boxes can have the following functions:

Even the most primitive models closed cabins have a radio receiver, top and side lighting, a seat, shelves, a dispenser for detergents and a mirror.

Criteria for choosing a quality shower cabin

It is necessary to choose a shower stall based on the needs of the family and the parameters of the bathroom.

Before buying a shower cabin, you need to test it: check the strength of the pallet (walk along the bottom of the cabin), look at the fastening of the frame with the pallet, try to swing the elements of the box (cabin High Quality shouldn't wobble)

Self-installation of a closed-type shower cabin

The shower installation scheme directly depends on the complexity of the design, and the assembly sequence for most models is the same.

Preparatory work

In order to have an idea of ​​how to assemble a shower cabin, you need to read the instructions that come with the kit.

Before starting installation, you need to prepare the following tools and materials:

  • building level;
  • silicone sealant;
  • spanners;
  • sharp knife;
  • crosshead screwdriver;
  • dye;
  • tassel;
  • gloves;
  • siphon for draining;
  • flexible hoses;
  • fum tape or tow;
  • chisel;
  • a hammer;
  • perforator;
  • simple pencil;
  • shower instructions.

The preparatory stage involves the implementation of a number of activities:

Pallet installation

The assembly of the shower cabin should begin with the installation of the pallet:


Fixing panels and railings

Before you start installing the panels, you need to decide on the location of the glasses. If there are no marks on the railings indicating the top and bottom of the part, then you can focus on the number of mounting holes - usually there are more of them on top.

How to install panels and railings:


At this stage, you need to check the work electrical devices(lighting, ventilation).

Roof and door installation

Before fixing the roof, it is necessary to install a backlight, a watering can and speakers on it.

The distance between the ceiling and the roof of the cabin must be at least 25-30 cm

For mounting the roof, you can use the existing holes, and, if necessary, make new ones. The roof is fixed with bolts and screws.

Shower doors are installed after mounting the side, rear walls and roof

Door installation sequence:


Now you can screw on accessories (shelves, mirror, dispenser) and fittings (handles, handrail).

Cabin connection to communications

It is necessary to bring cold and hot water. It is desirable that operating pressure booths (1.5-4 bar) coincided with the pressure of the water supply.

To connect the shower cabin to the mains, you must install a separate waterproof socket. The socket must be positioned so that there is no tension on the wire (optimally - on the side or behind the cab).

For a socket in the bathroom, it is advisable to install an RCD and allocate a separate electrical wiring line.

Assembling shower cabins (instruction): video

Installing a shower enclosure without a tray

Installation of a shower enclosure with a tray is practically no different from installation shower box. Differences arise if the shower cabin is mounted without a pallet - on the bathroom floor.

Before installing the cabin, prepare the base as follows:

  1. Decide on the size of the corner and choose a place for it.
  2. Perform waterproofing of the floor and adjacent walls.
  3. Install a drain ladder on the floor - a grate through which water drains into sewer system.
  4. The tiles on the floor of the shower enclosure must have a very low degree of slip.

For high-quality water drainage, the floor slope in the area of ​​the drain must be at least 3 °

Prevention of malfunctions and repair of a shower cabin

It is important to keep the shower cabin clean and control the operation of all its elements.

In order to prevent breakage, important details(mixer, nozzles, steam generator) you should take care of the quality of the water and install filters for mechanical water purification. Such measures will significantly reduce the risk of calcium formations on the working elements.

Once every three months, cartridges or cartridges in filters must be changed

Over time, the shower stall may start to leak. The main cause of the failure is poor grouting or deterioration of the silicone sealant.

In this case, the cabin in the places of leaks must be disassembled, the parts must be cleaned of contamination and residues of the old layer of sealant. After that, apply a new layer of silicone sealant, assemble the cabin and rub the seams well.

Assembling a multifunctional cabin complex design it is better to entrust it to a professional, and you can install a simple box or corner yourself, the main thing is not to rush and follow the instructions clearly.

Given the high cost of services such as installing showers, it makes sense to do this work yourself. To do this, you will need tools (a list of them will be given below) and appropriate experience with them.

You will also need instructions that describe in detail how the shower cabin is installed. As a rule, this description is attached to each product. famous brands such as: Avanta, Borneo HX, Atlantis Black, IDO Showerama, Coliseum, Oporto, Orion, Sapbox, Penta-g, Taiti, etc.

We will not clutter up the list too much, the picture shows only the most necessary, without which the installation will not be possible.

As you can see from the figure, we need:

  • A - level, will be required when installing the pallet;
  • B - screwdriver, can be replaced with a hammerless drill;
  • C - screwdrivers cross and slot;
  • D - adjustable or gas key;
  • E - drills for metal, as a rule, two diameters are enough - 3 mm and 6 mm;
  • F - bits for a screwdriver.

From Supplies we need: FUM tape for waterproofing connecting pipes, silicone-based sealant. Also, for sealing seams, it may be necessary polyurethane foam. If the cabin is not equipped with flexible connecting hoses, to connect to the water supply, you need to worry about purchasing them in advance.

As practice shows, the products of some manufacturers from the Middle Kingdom often have problems with the completeness of fasteners. There are no such problems with products of more famous brands: Victoria Serena EW, Wecost, Kaipunio, Lexus, Apollo GUCI, Niagara NG (Niagara), Artex AS, Timo (Timo) Evoli, Fiji, etc.

Installation order

Now let's move on to the installation steps. Conventionally, they can be divided into the following sequence of actions:

  • preparatory stage;
  • installation of a pallet in the bathroom-shower room and its connection to the sewerage system (installation of a siphon);
  • booth assembly (installation of walls, curtains, partitions, etc.);
  • connection of water supply, ventilation and, if necessary, electricity, for example, for a water heater, a cabin steam generator, as well as for models with hydromassage;
  • leak check before operation, if a leak is detected, it must be repaired.

Now let's look at each of these steps in more detail.

Video: Installation of a shower cabin in detail

and another video:

Preliminary preparation

Before starting the installation, it is necessary to ensure the supply of all necessary engineering communications. These include: sewerage system, water supply, ventilation and electricity. The latter is necessary for many models of modern booths, for example, Aumeia, Bas, IKA, Erlit, Eago, Sean, etc.

If necessary, dismantling old plumbing. When choosing a place in the house, the dimensions of the structure are taken into account, moreover, with the expectation that, if necessary, it would be possible to make repairs.

It should be noted that in rooms with high humidity, which include bathrooms, it is necessary to install moisture-proof sockets with a protection class of at least IP44. And the electrical equipment of such rooms must be connected through an RCD (separate if possible).

It is advisable to pre-level the floor at the installation site, for example, with a coupler, this will greatly facilitate horizontal adjustment during installation.

When the preparation of everything necessary is completed, a tray is installed in the shower room allocated for the shower.

Pallet installation

Given that many models have their own characteristics, make general instruction with step by step installation- problematic, but possible general recommendations and tips. As mentioned above, complete step by step guide on the installation of the pallet and the assembly of the structure at home should be attached to each product.

The first step is to install a drain system. Ideally, the drain hole of the pan should be located directly above the outlet to the sewer system. After that, the pallet is installed on the legs and leveled horizontally, for this, adjusting locking screws are provided. The horizontal is checked with a level.

Most cabins with acrylic pallet mounted on a special support frame, consisting of two crossbars, crossed with each other. At each end of such a crossbar, a leg with an adjusting locking screw is installed, and the fifth is located at the intersection of the crossbars, that is, in the center of the acrylic pallet.

Before proceeding to the next step, it is necessary to make sure that the connection between the pan and the drain device is tight. For this purpose, it is filled with water, and on drain hose a stub is placed. If everything is in order, we complete the installation of the shower cabin drain with our own hands, that is, we connect it to the sewer system.

Cabin assembly

As well as when installing a pallet, for this operation you will need instructions (as well as a connection diagram) for a specific model, and it is desirable that it be in Russian. Otherwise, without a description of the process, the installation will turn into an expensive puzzle, taking into account that the price of even a small 90x90 shower cabin is rather big.

In order not to encounter such problems, it is better to choose more well-known manufacturers shower enclosures, for example: Luxus LM, Shark, Aquarelle, Grado, Golf, Fresh, Arcus, FLV, etc.

Given the above, we can only give a generalized instruction and a few recommendations:

  • before installing panels and mounting glass railings on them, it is necessary to check the latter for defects. Then figure out where they have the upper and lower parts (as a rule, there are more holes at the top);
  • after we figured out the panels, we determine which of the guides are upper and lower. The former are usually wider;
  • further, glasses are inserted into the guides; for this, grooves are provided, which must first be lubricated with sealant for waterproofing. When the glasses are inserted, they are secured with presser feet;
  • a sealant is put on the glass, after which the guides are attached to the rack with self-tapping screws;
  • using a special mount, they are connected to the pallet side panels, then back (for some models, the order of fastening may be different);
  • when the assembly of the main structure is completed, all joints must be carefully lubricated with silicone-based sealant, and then let it harden (it may take about a day).

Sliding doors on the cabin must be installed last, immediately before the test run.

Connection to engineering systems

Connecting the water supply to the shower stall, as a rule, does not cause difficulties, it is no more difficult than connecting a conventional faucet. This is done using flexible hoses of the appropriate length, which are connected to the ball valves on one side and to the cab on the other.

To ensure reliable sealing at the joints, it is necessary to use FUM tape.

Connecting to electricity should also not be difficult, provided that it is carried out in accordance with the standards that establish safety rules. We list their main theses:

  • cab connection must be made separate cable corresponding section;
  • to the line from which power is supplied to the shower box, in without fail an RCD must be installed (in addition to a conventional circuit breaker);
  • the socket for connection must be of protection class - IP44.

Final stage

The operation of electrical equipment, the flow of water into the booth and its discharge are checked. Then the installation is done glass door, drain, protective panels, etc. If necessary, the joints are treated with sealant. This is followed by a leak test, if it was successful, then the installation of the shower cabin was carried out correctly and it is ready for operation.

A compact shower cabin is becoming a familiar attribute of a small bathroom. This is a great way to save space for washing machine or washbasin. In addition, there is nothing incredible in the fact that any man who can distinguish a drill from a screwdriver is able to cope with the installation with high quality. Assembling a shower cabin - a video with a process performed by another person will help you deal with a number of features that will insure the homeowner from further problems (for example, leakage or flooding of the apartment).

Right choice

The shower cabin is plumbing equipment, which, when installed in a standard apartment, may require minor (and sometimes quite significant) changes to the plumbing system.

Therefore, the video instruction for assembling a shower cabin should be supplemented with information about the selected model.

It is better to go to more than one store and preferably more than once.

Do not hesitate to carefully inspect the shower cabins and ask questions regarding the fastening of parts, the mechanism of operation sliding doors etc.

  • firstly, the collected information can be useful during further installation;
  • secondly, it will help determine the choice of the optimal model.

When buying a shower cabin, you should know:

Choose a shower enclosure with reinforced walls.

  1. One of important criteria is pressure.
    It varies not only depending on the model, but also depending on the plumbing of a single house.

Please note that the pressure in the water supply must correspond to the operating pressure of the selected shower cabin.

  1. Before paying, you should carefully read the instructions and check the correspondence of what is written with what is actually done. There is, for example, a mismatch in the size of the connecting holes.

The rest (shape, design, configuration, etc.) depends only on individual preferences.

Cause - time

Before starting installation, you can once again watch the video on how to assemble a shower cabin.

Learn the process. Try to remember the installation process thoroughly. Correct order guarantees not only installation without problems, but also the absence of unpleasant moments during operation.

If the video of the assembly of the shower cabin is still not deposited in your memory, draw up an action plan. If you are assembling a cabin for the first time, take your time.

Conditions for installing a shower cabin

The shower cabin in the bathroom can be located in the very corner of the room or adjacent to one of the walls, depending on.

To avoid leaks and premature breakage of the shower cabin during its installation, pay attention to:

  • before starting the installation of the shower cabin, care should be taken to complete the work on supplying hot and cold water, sewerage and electricity;
  • the distance from the floor surface to the upper edge of the sewer pipe should not exceed 7 centimeters; if it is higher, you need a podium;
  • before starting installation, make sure that the drain not only reaches the entrance to the sewer, but at the same time the necessary slope is provided. If the slope is not enough, you need to make a podium;
  • insufficient tightness of the shower cabin can lead to the formation of water mist in the bathroom, so you should take care of the exhaust ventilation;
  • check the electrical outlet: it must be equipped from the shower at a distance that will prevent moisture from entering;
  • if the question arises again, how to assemble the shower cabin yourself - the video will help, watch it again and get down to business.

Let's start assembling

When the installation site is prepared, the instructions are carefully studied, and you are still full of desire to install a cheap cabin yourself, let's start assembling:

Cabin layout

  1. Install the pallet slightly away from the main assembly area. Please note for correct installation drain drain must not forget to remove the "apron".
  2. Install side walls and guides door structure, connecting them with an existing fastener, use sealant, standard and additional fasteners.
  3. Install the cab top dome.

Upper cabin dome after installation

  1. The assembled cabin must be left for a while. The sealant needs to dry (from 12 to 24 hours).
  2. Set the cab to permanent place. You should make sure that there are no kinks and that there is the necessary slope. Make sure the design is tight.
  3. Install and adjust the doors according to the instructions.
  4. Install the "apron" of the pallet.

It looks like a shower tray without an "apron"

  1. Use and enjoy.

Assembling the shower cabin on your own - videos and instructions will undoubtedly help - the process is responsible, but it is quite within the power of anyone who seeks to make housing comfortable.

Now many people refuse traditional baths and give their preference to showers. To save your money, the shower box can be purchased unassembled. Depending on the model, you can save up to 20% on assembly. Assembling a shower cabin is a responsible process that consists of several stages.

Do-it-yourself shower cabin assembly

In this article, we tried to consider,. We are sure that thanks to our instructions you will quickly install a shower cabin.

Preparatory stage

After the shower cabin is delivered to your home, you need to take care of its connection to communications. To get started, you will need a shower enclosure assembly diagram. Usually it is presented in the instructions.


How to assemble a shower cabin according to the scheme

Basically, the shower consists of the following elements:

  • pallet;
  • roofs;
  • doors;
  • walls.

At the stage of delivery, check that the instructions are present in the kit. Before assembling a shower cabin with your own hands, you should also prepare necessary tools. The list of tools should include:

  • instruments;
  • consumables;
  • sewer fittings.

List of tools for assembling a shower cabin

If in the future the shower will be connected to electricity, then electrical fittings should be prepared.

It is important to know! Make a connection simple models shower cabins is not difficult. If the shower box contains additional functions, then certain difficulties may arise with the connection process.

The main stages of installation

To date, assembling a shower cabin with your own hands consists of the following steps:

  1. Installation of the base and its further supply to communications.
  2. Installation of walls and other elements.
  3. Connection of water supply, as well as electrical cable.
  4. Leak test and test run.

At self assembly, you need to remember that all mounting bolts must be tightened to the end. First, professionals recommend performing pre-assembly to check that all connections are correct. To connect the walls and other elements, you will need to use a sealant. This substance allows you to ensure the permeability of the finished structure.

Pallet installation

It is necessary to install the pallet at the moment when the drain hole is connected. This is one of the most milestones, because if there is a leak, then you can flood the entire apartment. Install the pallet in the following order:

  • Attach the legs to the bottom of the pallet. They rotate and, if necessary, they can be leveled. This allows for greater stability.

Installing the pallet on metal carcass
  • Implement . It is best to use not a corrugation, but a rigid pipe, as it is easier to clean.
  • Connect the siphon to the sewer.

To connect all sewer parts, it is better to use a sealant. This material provides a secure connection.

Wall mounting

When the pallet is fully installed, you can begin to collect the walls. This process consists of the following steps:

  • coat all guide structures with a transparent sealant;
  • now you can install the glasses and press them with your paws;
  • apply silicone along the edge of the pallet;
  • side panels must be fixed to the pallet.

If during the work the sealant gets on the glass, it must be removed immediately. After drying, it will be extremely difficult to eliminate the sealant from the glass.


After completing the assembly of the structure, it must be left for a while. It will take 2 days for the sealant and silicone to dry completely. After that, you can proceed to further assembly of the elements.

Roof and door installation

Before fixing the roof, it is necessary to mount a watering can, a fan and lighting, if provided, in it. Also some modern designs provide for the installation of speakers. It is best to fasten all parts to self-tapping screws or sealant. Due to this, the leakage of certain elements can be prevented. After installing all additional elements you can fix it on the roof with self-tapping screws.

It is necessary to proceed with the installation of doors only after fixing the roof. If the door is sliding, then it is mounted on special rollers. Typically up to 8 rollers are used. When the door is fixed, you can begin to install handles and other fittings.

Electrical connection

Some models of shower cabins also require a power connection. Electricity is needed for models that have a hydromassage or a steam generator.


The hydromassage shower cabin is technical novelty

For connection, it is better to use a copper cable with a cross section of 2 sq. mm. If your shower consumes more than 5 kW per hour, then you need to connect a separate machine. It will turn off the power when a short circuit occurs. Electrical connection is a responsible task. Therefore, if you cannot cope with the connection, then it is better to call specialists.

Water connection

The last stage of the assembly includes connecting the water supply. This requires hoses, as well as metal-plastic pipes. The installation procedure is as follows:

  1. First, all materials should be prepared.
  2. Turn off the water supply and connect the taps for the water supply.
  3. Connect the pipes to the shower stall and faucets.
  4. Turn on the water to check the system for leaks.

Connecting the water supply to the shower cabin on the diagram

The water that comes from the tap is not always clean. Therefore, sometimes the whirlpool jets can become clogged. To prevent this problem, it is necessary to use filters to clean the water. If you live on the upper floors, then the pressure may not be enough. To increase the pressure, a tank may be required, as well as a pump. Before starting the shower cabin for the first time, it is necessary to check the tightness of all joints and connections.

After the visual inspection you can turn on the water supply. If leaks form, they must be removed immediately. Now you know how shower enclosures are assembled. We hope this information was useful and interesting.

Video gallery

With your own hands it’s not difficult at all if it comes with a clear and clear instruction with detailed description every action. Well-known world brands, whose products belong to the middle or expensive price segment, provide their customers with such guides. The task is simplified by all kinds of marks and stickers indicating the top or bottom of the part, its front or reverse side. Those who, due to a shortage financial resources I had to prefer a Chinese-made shower cabin, they are not spoiled with such care. All they have is a page of cryptic writing in Chinese English, a burning enthusiasm, and a desire to save money by doing the assembly themselves. Next, let's look at how to assemble a shower cabin made by Chinese craftsmen and remain unscathed.

First of all, the buyer should make sure that his cabin arrived to him safe and sound. The weakest link is glass. The test is facilitated by the fact that the glass for the shower cabin is subjected to hardening, therefore, with strong impacts, they simply crumble into small fragments. If you do not hear rattling when shaking the package, then everything is in order with the glasses.

Fittings and fasteners are in a separate box. The absence of several washers of self-tapping screws or some other little thing has become a good tradition, so you should not be surprised and indignant at this. Also get ready for the fact that some accessories will have to be replaced.

Instruments

Before assembling a shower cabin, you need to prepare a small list of materials and tools:

  1. Washers for M16 thread.
  2. A high-quality siphon (the one that comes with the kit, as a rule, can be thrown away immediately).
  3. Sanitary silicone sealant.
  4. Crosshead screwdriver.
  5. Set of wrenches.
  6. Long building level.
  7. Gloves.
  8. Dye.
  9. Tassel.
  10. Some old but clean clothes, which can be dissolved into rags.
  11. Soap.

Back to index

Pallet installation

Before starting the operation, put on gloves, otherwise you can pick up a splinter from the fiberglass from which the pallet is made.

  1. Now you need to screw the long studs into the seats intended for them at the bottom of the pallet. In most models of this class, turn the legs in a strictly vertical position impossible, but there is no particular need for this.
  2. Screw a nut onto each stud.
  3. We put one washer on the nuts.
  4. Now you need to install the crossing parts of the support frame. In the event that there are noticeable irregularities on the pallet, Penoplex gaskets can be placed under the frame to compensate for them. Please note: the welded overlay should look in the opposite direction from the pallet. If it is deployed to the pallet, it will be in a partially suspended state due to the resulting skew.
  5. The central leg should be screwed into the nut that is welded to the shortest part of the support frame. Then a washer is put on the leg and another nut is screwed on, which should be tightened to the stop. At the end, we screw the nut again - this will be the support locknut for the leg, the height of which can be adjusted using the thread.
  6. To fix the fixing beams in the pallet are mounted wooden bars to which the beams are screwed with self-tapping screws. Bolts of fastening and support can be tightened only after all self-tapping screws are completely screwed in. Otherwise, they may be pulled out of the tree due to skew.
  7. That's it metal parts can be painted, otherwise they will rust over time.
  8. The height of the legs should be adjusted with a level and tightened with locknuts, but only slightly, since after the pallet is in place, their height will have to be adjusted slightly. It is also necessary to install brackets under the legs, on which the pallet screen will be mounted. You should not rush to install the screen (contrary to the instructions attached to the cab), this should be done only after connecting the cab to engineering networks and the final adjustment of the legs in height.
  9. We proceed to the installation of the siphon. As already mentioned, the best option there will be a purchase of a full-fledged siphon instead of the one that comes in the kit. If you still decide to mount the "native" drain device, then its corrugated hose must be bent in the shape of the letter "U". Such a bend will ensure the formation of a water seal, which will not give odors from sewer pipe get into the bathroom through the drain hole of the cabin. It is better to dismantle the spring-loaded plug with the image of the foot installed on the drain. After short period operation, it begins to act up: it is easy to press it to close the hole, but in order to “squeeze” it back, you will have to suffer.

Back to index

Fence Assembly

Figure 1. Shower tray installation diagram.

In the absence of marking upper part glasses can be identified by a large number holes. In addition, this part is wider than the lower one and, unlike it, does not have figured cutouts. Glasses have a frame in which grooves are made for fastening to the elements of the fence.

Having pushed the glass, it is necessary to lift it and grease the place where it rests, silicone sealant. Now the glass can be lowered and fixed by tightening the screw on the clamping bracket.

Excess sealant is best removed by soaking in soapy water finger. After that, the place where the sealant was wiped off is enough to wipe with a clean cloth or napkin. The lower and upper parts of the rack must be screwed to the arch with self-tapping screws.

Next, a silicone seal must be put on the glass. It is important not to confuse the direction: the seal petal should look inward. Seal the connection with sealant should not be. Do not try to get the seal under the clamping bracket, it is unlikely to fit there.

Now the fence can be installed on the pallet (Fig. 1), having previously smeared the latter with sealant. When applying sealant, make sure that it does not fill the recess in the pan, designed to drain water. No need to screw the fence to the pallet with self-tapping screws.

Attach the side panels to the pallet by screwing them with self-tapping screws with washers. The places where the panels adhere to the pallet and the fence should also be sealed with sealant. You should not immediately tighten the screws “tightly”, since the mounting holes in the panels and the pallet may not match. Tighten the fasteners evenly, then the panel will gradually fall into place without stress.

The installation scheme of the rear panel is completely identical to the installation scheme of the side panels.